Forum » Europe – Western
Topic

Limits for VOC content outside US, additional questions

CS-2009 IEQc4.1: Low-emitting materials - adhesives and sealants
posted by Ernst Schriefl on Apr 17, 2019, 12:14 pm

All the limits on...

Submitting a credit during the review process which was not submitted at first application

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Ernst Schriefl on Apr 17, 2019, 6:58 am

I have a general question regarding the review process:

Say, you have already submitted a certain amount of credits for review and received a preliminary review.

While some credits...

Last reply: Michael Smithing, Apr 17, 2019, 11:16 am

Bicycle racks distance

CS-v4 LTc6: Bicycle facilities
posted by Guillaume Rose on May 28, 2018, 5:41 am

Hi, 

In my Project, there are 2 bicycle areas : 

- 1 at the same level as the entrance but the distance is more than 30 meters

- 1 in the basement, but a lift dedicated to...

Last reply: Emily Purcell, Mar 27, 2019, 9:57 am

Double skin facade

NC-v4 EAp2: Minimum Energy Performance
posted by Sarah Leenknegt on Mar 12, 2019, 3:48 am

Hi

How do I model a naturally ventilated double skin facade in proposed and baseline building?

- proposed building: as designed, with a thermal zone for the intermediate area. The...

Last reply: Sarah Leenknegt, Mar 26, 2019, 3:21 am

Are Parking areas for Buses and Taxis included in Option 2

NC-v4 SSc5: Heat Island Reduction
posted by Stephan Zweig on Feb 21, 2019, 5:46 am

Hello to all,

Do you  have any suggestion if I have to include for Option 2 of heat island  reduction credit the following:

1) Parking lots for Buses?

2) Taxis waiting areas...

Last reply: emily reese moody, Mar 12, 2019, 9:31 pm

Permanently installed drip irrigation system

CS-2009 WEc1: Water Efficient Landscaping
posted by Andreas Hintz on Feb 22, 2019, 9:01 am

In accordance with the requirements of this credit, the project team has developed and will implement a water-efficient landscape stategy. The project is aiming for Option 2, No...

Last reply: Tristan Roberts, Feb 22, 2019, 10:03 am

Sewage treatment plant used as alternative water source

NC-v4 WEc2: Indoor water use reduction
posted by Stephan Zweig on Feb 13, 2019, 7:15 am

Hello to all,

My building uses water for the toilets and for the irrigation from a municipally sewage treatment plan with biological treatment.

Does this source count as...

Last reply: emily reese moody, Feb 18, 2019, 2:16 pm

LEED CS 2009 SSc4.3- Option 1 Preferred Parking

CS-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Nicole Isk on Feb 8, 2019, 9:42 am

Dear all,

our LEED v3 Core & Shell project is  a mixed use project with retail and hotel part. The building is a part of a bigger shopping mall and business complex. The parking garage...

Last reply: Allison Smith, Feb 8, 2019, 10:48 am

final fit-out on tenants request-> designing provisions for negative pressure difficult

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Mark Kumar Bose on Jun 3, 2018, 6:12 pm

Hi,

how do deal with the fact that often the final office floor plans will be fixed later on tenant request so that the technical provisions (negative pressure, etc.) for copy rooms can...

Last reply: Mark Kumar Bose, Jan 14, 2019, 2:56 pm

Green electricity

CS-v4 EAc7: Green power and carbon offsets
posted by Guillaume Rose on Jan 8, 2019, 5:12 am

Hi, 

I work on a 100% electric project.

The owner will subscribe to a 3 year contract with a company that provide a 100% green electricity. On this contract it's specified it will...

Last reply: Marcus Sheffer, Jan 8, 2019, 10:58 am