Log in
Forum » Middle East
Topic

Project Name maximum character limit

Living with LEED Online - quirks, bugs and hiccups
posted by Manivannan Devaraj on Jan 21, 2020, 3:35 am

What is the maximum character limits for Project Name character

Last reply: Bill Swanson, Jan 21, 2020, 10:39 am

7.6.1.2 Extracting Fan Power – Baseline Design

NC-v4 EAc2: Optimize Energy Performance
posted by Amal Venugopal on Nov 4, 2019, 8:59 am

Hi Sir,

Greetings!

The following content is copied from,

Page No,38 of...

Last reply: Tyler Thumma, Dec 20, 2019, 11:01 am

WE Outdoor water reduction

NC-v4.1 WEp1: Outdoor water use reduction
posted by Geneva Guerin on Dec 13, 2019, 3:42 pm

Are potted plants and trees (in raised beds on outdoor covered terraces within the site boundary), counted as vegetated surfaces for this prerequisite?

Last reply: Dave Hubka, Dec 17, 2019, 4:16 pm

four buildings with a public square

ND-Plan-v4 NPDp1: Walkable Streets
posted by Sareet Benayahu on Oct 10, 2018, 7:11 am

Hi,

Our LEED ND-Plan Project has a few Large Lots, on which there are three or four buildings planned at the edges of the lots and in the center a large public square. There are wide...

Last reply: David Posada, Nov 25, 2019, 8:22 pm

Does the LCA must cover the 100% of building envelope and structural elements?

NC-v4 MRc1: Building life-cycle impact reduction
posted by Sara BENLOUBA on Oct 16, 2019, 12:20 pm

To earn the 3 points on this credit, Question 1: Do I need to know life cycle analysis for 100% of my structural and envelope products? Even small products like tightness, ...? steel that exists...

Last reply: Panu Pasanen, Oct 18, 2019, 4:15 am

municipality irrigation line

CS-v4 WEc1: Outdoor water use reduction
posted by Radwa Amin on Apr 1, 2017, 11:54 am

the district that the project is located in has a municipality water line dedicated to irrigation and it is not potable water (recycled).
Does that count as an alternative water sources?...

Last reply: , Oct 15, 2019, 3:26 am

Modeling baseline with System 2 of proposed hotel building with system 8

CS-v4 EAp2: Minimum Energy Performance
posted by Natalia Quintanilla on Oct 9, 2019, 6:32 pm

Hi, 

I'm modeling a 12-floor hotel building located in Dubai that uses System 8:...

Last reply: Natalia Quintanilla, Oct 14, 2019, 2:50 pm

ASHRAE 90.1.2010 Mandatory & Prescriptive Requirements vs Energy Model

CI-v4 EAc2: Optimize Energy Performance
posted by SSN Energy Model on Oct 9, 2019, 9:57 am

Hi to all,

I am doing energy model for one of our LEED CI Project under v4 rating system. 

The following contents are copied from reference guide,

Option 1. Tenant-level...

Last reply: Marcus Sheffer, Oct 11, 2019, 10:17 pm

Can consider the air cooled chiller yard as central plant

CI-v4 EAp2: Minimum Energy Performance
posted by SSN Energy Model on Oct 9, 2019, 10:23 am

Hi to all,

Greetings!

I am doing Energy Model as per design documents of office space which has target for LEED ID+C Gold v4.

The baseline system should be System 8 (...

Last reply: Marcus Sheffer, Oct 11, 2019, 9:50 am

ASHRAE 90.1.2010- Baseline System using Exception of G3.1.1

CI-v4 EAp2: Minimum Energy Performance
posted by SSN Energy Model on Oct 2, 2019, 2:01 am

Hi,

Greetings!

We are doing the energy model for Office space which has registered under LEED ID+C v4. The overall floor area of the project space is 45,000 Sq.ft & the overall...

Last reply: SSN Energy Model, Oct 2, 2019, 8:49 pm