Forum » Mexico
Topic

LEED Boundary for an Existing Multitenant Building

EBOM-2009 MPR3: Must use a reasonable site boundary
posted by Gabriela Crespo on Dec 22, 2015, 4:49 pm

Dear All,

We are working on a multi-tenant project in Mexico that wishes to pursue LEED O+M Certification, there are two areas on the ground floor with tenants who do not wish to...

Waste generated by mobile offices within the project

NC-2009 MRc2: Construction Waste Management
posted by Tonatiuh Valencia on Dec 12, 2015, 12:27 pm

Michelle Reott Managing Principal Earthly Ideas LLC LEEDuser Expert 620 thumbs up December 15, 2015- 11:31 am Tonatiuh- Welcome to LEEDuser. As a guest, you can't access the FAQs above, one of which directly answers your question. The short answer is yes- this waste should be captured.The FAQ contains more detail. Also, please be sure to click the "Single-page view" link at the bottom of the page so you can view all questions and answers on this forum at one time and thoroughly search them before posting your question. Here is one that also answers your question that you must not have seen-...

Last reply: Michelle Reott, Dec 15, 2015, 11:31 am

Naturally Ventilated, Mechanically Cooled space

NC-2009 IEQc7.1: Thermal comfort - design
posted by Gabriela Crespo on Nov 26, 2015, 1:29 pm

In ASHRAE 55, Section 5.3 Optional Method for Naturally Conditioned, it mentions that "There must be no mechanical cooling system for the space".
We are working on a residential project...

Last reply: Gabriela Crespo, Dec 1, 2015, 11:38 am

Balancing Devices to meet ASHRAE 90.1 Mandatory Requirements

NC-2009 EAp2: Minimum Energy Performance
posted by Jorge Torres-Coto on Nov 13, 2015, 12:23 pm

We have a project that is an industrial facility, it shares the CHW distribution piping between the comfort system and the process system.

We are informing the CxTeam that it is required...

Last reply: Marcus Sheffer, Nov 30, 2015, 10:56 am

Main entrance and LEED Project Boundary for Future Expansion

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by Lourdes Salinas on Aug 25, 2015, 7:32 pm

Hi everyone, we are pursuing the LEED Core & Shell certification for a Campus Project. We received the preliminary design review for the projects inside the LEED Campus Boundary. The...

Last reply: Tristan Roberts, Nov 27, 2015, 9:30 am

Balancing Devices to meet ASHRAE 90.1 Mandatory Requirements

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Jorge Torres-Coto on Nov 13, 2015, 12:20 pm

We have a project that is an industrial facility, it shares the CHW distribution piping between the comfort system and the process system.

We are informing the CxTeam that it is required...

Last reply: Scott Bowman, Nov 19, 2015, 1:52 pm

Role

LEED for Homes (LEED-H) Forum
posted by Gustavo De las Heras Izquierdo on Nov 8, 2015, 6:26 pm

Who is responsible for reviewing project drawings, specs and calculations BEFORE submitting them to the builder: the QAD, the Green Rater or a LEED for Homes Consultant?

Our experience...

Last reply: Asa Foss, Nov 9, 2015, 9:41 am

Case2 Option 1- Labs

EBOM-2009 EAc1: Optimize Energy Efficiency Performance
posted by Alicia Villanueva on Sep 7, 2015, 3:13 pm

The project is an innovation center, it has offices (63%), laboratory (28%) and data center (8%), the lab represents more than 10% of the area, we have to use the USGBC Calculator Case 2 Option 1...

Last reply: David Eldridge, Sep 8, 2015, 8:29 am

Desktop C02 Monitors

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Diego Garcia on Jul 29, 2015, 7:52 pm

Hi,

We are currently working on an office building, we want to achieve IEQ cr1, by installing C02 monitors in all spaces. (The building has rooms with mini-plits and windows so we will...

Last reply: Andrew Mitchell, P.E., Aug 15, 2015, 12:03 am

Exterior space, partially enclosed- Application of Std.

NC-2009 IEQp1: Minimum IAQ Performance
posted by Mauricio Ramirez on Jul 1, 2015, 9:07 pm

Hello in a Museum, we have an uderground open space, that, on our understanding is an exterior space, as it is outside the Access vestibule. It has a roof overhang but have a completely and...

Last reply: Gustavo De las Heras Izquierdo, Jul 6, 2015, 6:20 pm