Topic | Recent |
---|---|
Basement Ventilation exceptional calculationsNC-2009 EAp2: Minimum Energy Performanceposted by Rathnashree Bharadwaj on Nov 20, 2014, 2:28 am
Our project has 4 basements with fresh air, exhaust and circulation fans. The logic of exhaust fan functioning is designed such that during normal mode only few fans operate, during pollution... Last reply: Marcus Sheffer, Nov 21, 2014, 9:47 am |
|
MIXED MODE VentilationCI-2009 IEQp1: Minimum IAQ Performanceposted by Sathish Kumar on Nov 11, 2014, 1:08 am
May i know, what are the documents are providing clarity on designing the mixed mode ventilation strategies? |
|
Selection of HVAC Baseline SystemNC-2009 EAp2: Minimum Energy Performanceposted by Praveenbabu Rajkumar on Oct 23, 2014, 6:26 am
Hi, Sorry for my English Any one can suggest, which is correct baseline HVAC system for following project description. No. of Floors: 7 - including terrace floor (B+G+4+... Last reply: Marcus Sheffer, Nov 2, 2014, 6:29 pm |
|
Long Term Service ContractNC-2009 EAc4: Enhanced Refrigerant Managementposted by Erin Holdenried on Oct 13, 2014, 1:40 pm
Does anybody have an example of a long term service contract, or know specifically what needs to be included in the contract in order for it to be accepted by the... |