Topic | Recent |
---|---|
Chilled Beam System Energy Modeling- CS v2009CS-2009 EAp2: Minimum Energy Performanceposted by Shenhao Li on May 6, 2016, 5:14 am
Hello Everyone, I have an office project which is designed to use a little compicated HVAC system. There are 3 Central Heat Recovery Units on the roof top to provide pre-cooled/heated... Last reply: Shenhao Li, May 10, 2016, 5:55 am |
|
Non-direct Purchase ItemEBOM-2009 MRc1: Sustainable purchasing - ongoing consumablesposted by Ran Zhang on Apr 26, 2016, 2:15 am
The project I am working for does not pay for any toner cartridges as they are included in the maintenance contract. In this case, shall we count it zero or need to get the standard price if they... |
|
CCHP ModelingNC-2009 EAp2: Minimum Energy Performanceposted by Jie Shen on Apr 22, 2016, 5:04 am
Consultant ERM Apr 20 2016 Guest CCHP System modeling Project Location: Japan My project is provided by CCHP system which owned by third party, the CCHP... Last reply: Marcus Sheffer, Apr 25, 2016, 3:28 pm |
|
CCHP System modelingNC-2009 EAp2: Minimum Energy Performanceposted by Jie Shen on Apr 20, 2016, 10:07 pm
My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat recovered gas absorption chiller, two normal chillers and two boilers. |
|
DCV requirement for high-occupancy areasCS-2009 EAp2: Minimum Energy Performanceposted by Shenhao Li on Apr 4, 2016, 11:50 pm
Hello! Last reply: Marcus Sheffer, Apr 5, 2016, 10:48 am |
|
single zone or multi-zone calculation?NC-2009 IEQp1: Minimum indoor air quality performanceposted by Hongyun Zhou on Mar 29, 2016, 2:04 am
I have a project, which have two types of system: Last reply: Hongyun Zhou, Mar 31, 2016, 9:41 pm |
|
LEED EBOM EAP2 Minimum Energy EffiuciencyEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by ABDUL MUTHALIB MOHAMED on Mar 30, 2016, 11:22 pm
Hi, Last reply: Ben Stanley, Mar 31, 2016, 12:15 pm |
|
printing room in an open officeCI-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by ANNA SUN on Mar 17, 2016, 5:43 am
a small printing room in an open office, no... Last reply: Allison Beer McKenzie, Mar 17, 2016, 9:45 am |
|
US standard and red cross:posted by Takayuki Hirota on Feb 10, 2016, 4:25 am
I have a project in Japan that may use this pilot credit. But I need more clarification and information in the credit requirements: i) What U.S. standard and which part of it do we need to... Last reply: Takayuki Hirota, Mar 16, 2016, 8:43 pm |
|
some questions about kitchen and toilet ventCS-2009 EAp2: Minimum Energy Performanceposted by Shenhao Li on Mar 4, 2016, 3:46 am
Hello! I had submit a project for cs2009, and got some comments confused. The project is a high rise building consists of retails, restaurants and offices. 1. Table 1.4.6 and Table 1.4.7A... Last reply: Shenhao Li, Mar 6, 2016, 8:24 pm |