Log in
Forum
Topic

Warehouses & EV Charging stations on parking

Warehouses-NC-v4 LTc8: Green vehicles
posted by Charline SEYTIER on Jun 23, 2017, 5:11 am

Dear all,
we are currently working on a LEED Warehouses project including also some offices and a parking area. The owner will not follow the LEED Warehouses requirement for electrical...

Last reply: Cindy Quinn, Aug 25, 2020, 6:29 pm

No cooling tower in design but core and shell spaces modeled as neutral with cooling tower in energy model.

Pilot-Credits WEpc94: No Cooling Tower
posted by Chris Yates on Sep 7, 2018, 9:48 am

A project I am working on meets all the requirements for the design (no cooling tower, no use of the latent heat of the evaporative cooling of water, no cooling from a District cooling system)....

Last reply: Maureen Drullard, Aug 25, 2020, 3:09 pm

Monitoring based Cx independent of Advanced Energy Metering?

NC-v4 EAc1: Enhanced Commissioning
posted by Joyce Kelly on Aug 25, 2020, 12:19 pm

Our project is pursuing MBCx but the budget cannot support achievement of all rqmts of Advanced Energy Metering. Can we achieve one without the other?

Last reply: David Hubka, Aug 25, 2020, 2:00 pm

CLASS 1 AIR SEPERATION DISTANCES_62.1 2010

NC-v4 EQp1: Minimum indoor air quality performance
posted by Fotis Kotsopoulos on Aug 25, 2020, 12:24 pm

In case of a central...

Documentation Requirements

Pilot-Credits SSpc55: Bird collision deterrence
posted by Kristina Kouyoumdjian on Aug 24, 2020, 11:56 am

Hello,

In terms of documenation required to be submitted for this credit, under "Building facade and site features" it reads to include a material list and supporting data for materials...

Minimum Requirement for Bicycle Facilities Credit

NC-v4 LTc6: Bicycle facilities
posted by Nuttanee Vongveeranonchai on Aug 25, 2020, 7:30 am

Dear All, 

I have a question regarding the minimum requirement of the Bicycle facilities credit. Our project is a conference center located in the center of Bangkok, Thailand....

Weatherproofing Barrier Primer

NC-v4.1 EQc2: Low-emitting materials
posted by Diana Smiciklas on Aug 10, 2020, 9:20 am

Hello there,

Are materials used to adhere the waterproofing and/or weatherproofing membranes excluded from low-emitting requirements regardless of what side it’s applied to? For example, a...

Last reply: Keith Robertson, Aug 24, 2020, 12:54 pm

Requirements to meet CO2 monitoring

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Lise Dannesboe on Apr 26, 2019, 8:42 am

Hi All

Hope someone can specify the following. When the credit requires "Provide a control drawing sample showing the...

Last reply: Jonathan Weiss, Aug 24, 2020, 12:30 pm

VOC content requirements for wet-applied products

NC-v4 EQc2: Low emitting materials
posted by CINDY CHAI on Jul 7, 2020, 10:26 pm

Hi All! Appreciate if someone can help with the following.

The reference guide states that for projects outside the U.S., all paints, coatings, adhesives, and...

Last reply: Reinhard Oppl, Aug 24, 2020, 10:40 am

Database fro CDPH Emission Testing compliant materials

NC-v4 EQc2: Low emitting materials
posted by Summer Gorder on Aug 22, 2020, 1:46 pm

Where can I find a database fro CDPH Emission Testing compliant materials?

Last reply: Reinhard Oppl, Aug 24, 2020, 10:35 am