Log in
Forum » LEED Rating System Selection
Topic

CI minimum scope of work?

LEED Rating System Selection
posted by Michael Smithing on Oct 28, 2016, 3:23 am

Is there a minimum scope of work to certify a project under LEED CI? I somehow remember a requirement that at least one room be unavailable for regular use for a minimum period of time (1 day?)...

Last reply: Tristan Roberts, Jan 15, 2017, 2:19 pm

Can LEED for New Construction be used for Ronald McDonald House

LEED Rating System Selection
posted by cathy keagle on Sep 1, 2016, 11:40 am

Our client is going to construct a two story Ronald McDonald House. The community where it where be built is zoned for Commercial MultiFamily Housing. The meter will be a commercial meter for...

Last reply: Tristan Roberts, Jan 15, 2017, 1:42 pm

Mixed Use Residential plus hotel V4 Version?

LEED Rating System Selection
posted by Beth Mosall on Oct 11, 2016, 12:40 pm

Project is on an urban site, 1.5 acres, brownfield, will be fully built out with a 2 level parking deck with retail on two sides, on top of which 3 buildings and a terrace garden will be built. 2...

Last reply: Beth Mosall, Oct 11, 2016, 2:44 pm

CI or NC?

LEED Rating System Selection
posted by FRAGKISKOS LEVANTIS on May 2, 2016, 1:03 pm

Dear all,
A client of mine is building a convention center and he will be operating it. Core and Shell works have been completed. However they are not well documented. Interior works will...

Last reply: Emmanuel Pauwels, Sep 30, 2016, 10:42 am

LEED Rating System for tenant in existing building

LEED Rating System Selection
posted by Jennifer Isaac on Jun 15, 2016, 10:08 pm

My client is a pharmaceutical facility that occupies part of the area of an existing building. The pharmaceutical facility space went into major renovations about 4 years ago and has been in...

O+M: Retail or ID+C: CI

LEED Rating System Selection
posted by Yulia Chen on Jun 14, 2016, 4:50 pm

Hi,

We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011.

Is it possible for us to go for Commercial Interior cert even though we missed...

C&S or NC?

LEED Rating System Selection
posted by Claire PIMET on Jun 10, 2016, 10:44 am

I’m contacting you regarding a project in the center of Paris. The client wants to go with a LEED certification on this project. The project is an existing building and the major refurbishment...

Major renovation for NC and C&S

LEED Rating System Selection
posted by OSCAR DE LA RED on May 30, 2016, 3:13 pm

If there is not an exterior Work on envelope but there is a core MEP alteration ,could a project be certified as a NC LEED Project (or C&S)? According to the rating system selection guidance...

LEEDv4- College Building Which Rating?

LEED Rating System Selection
posted by ankur khandelwal on May 25, 2016, 3:39 am

We have a project in Texas which is having two Academic buildings (not connected) in a College, both of 4 floors having Lecture Theaters and Library. Will this be resisted in LEEDv4 BD+C: New...

LEED NC: MR or LEED EBOM

LEED Rating System Selection
posted by ABDUL MUTHALIB MOHAMED on Apr 22, 2016, 5:43 am

We have a manufacturing facility that under going addition of 30% of total floor area and wish to apply for LEED certification.

Can we use the LEED NC? or
Should we use LEED...

Last reply: ABDUL MUTHALIB MOHAMED, Apr 23, 2016, 12:51 am