Log in
Forum » Europe – Western
Loading...
Topic

LTc4- Long-term bicycle storage, Bicycle maintenance program

Retail-CI-v4 LTc4: Bicycle facilities
posted by Valentin Grimaud on May 4, 2016, 4:41 am

Hi, I am working on a store located on the groung floor of a mall. This store has a room on the first floor (accessible by stairway) with a sufficient area to store two bicyle, can we consider...

Last reply: Marilyn Specht, Jan 17, 2017, 7:53 pm

DES in non-roof measures

CS-v4 SSc5: Heat Island Reduction
posted by on Sep 21, 2016, 11:03 am

Hello, I am working in a...

Last reply: Tristan Roberts, Jan 17, 2017, 3:04 pm

Financial donation

NC-v4 SSc2: Site development - protect or restore habitat
posted by Florian Schmidtchen on Dec 7, 2016, 4:10 am

Dear all,
As we all know it is possible to get ‘Exemplary-Performance-Points’ by double the appropriate credit requirements. Considering what we believe that in this case it is not...

Last reply: Trista Little, Dec 21, 2016, 6:56 pm

Renewables outside LPB & owned by Project- Campus or no Campus?

NC-v4 EAc5: Renewable energy production
posted by Anne Caminade on Dec 8, 2016, 6:50 am

Hi, We have a new small building on a large industrial site in Switzerland (same owner for the entire site) that we want to certify with LEED Gold (only the new small building) and we have no...

Last reply: Marcus Sheffer, Dec 8, 2016, 12:42 pm

Brownfield remediation

NC-v4 LTc3: High Priority Site and Equitable Development
posted by Florian Schmidtchen on Dec 7, 2016, 3:47 am

In Germany the (property) owner has to arrange inquiries regarding the soil pollution and burden by weapons, explosive ordnance and combat equipment (military hazardous waste).
The project...

Last reply: ALBERTO HERNANDEZ, Dec 7, 2016, 6:35 am

n/a

NC-v4 EQc5: Thermal comfort
posted by Anaïs P on Oct 26, 2016, 11:18 am

Hello,
I am working on trying to obtain the indoor environmental quality-thermal comfort credit for a new construction. The building contains new open-office workstations. The credit states...

Last reply: Kristina Bach, Oct 26, 2016, 1:13 pm

Performance Metric for Powered Equipment

EBOM-2009 SSc2: Building Exterior and Hardscape Management Plan
posted by LUCY WILLIAMS on Apr 7, 2015, 9:23 am

The LEED User "Powered Equipment Inventory" Worksheet, located under the "Documentation Toolkit" tab provides guidance on performance metrics as follows:
How to document performance based...

Last reply: cathy keagle, Oct 12, 2016, 4:03 pm

smoking on private balconies

NC-v4 EQp2: Environmental tobacco smoke control
posted by Andreas Hintz on Sep 9, 2016, 9:33 am

We have an upcoming international new construction project of a multi-family residential building. Due to its numbers of stories LEED NC v4 is the most appropriate rating system to use.

...

Last reply: Trista Little, Oct 5, 2016, 1:08 pm

HOTEL Project Default Occupation

CS-2009 PIf3: Occupant and Usage Data
posted by Amanda Johnson on Sep 14, 2016, 8:32 am

Hello,
Using the Annexe 1 C&S default occupation values, a hotel would have...

Last reply: Kristina Bach, Sep 20, 2016, 10:13 am

Exterior lighting power

NC-v4 EAp2: Minimum Energy Performance
posted by Julien Richard on Sep 8, 2016, 10:08 am

Hello,

We have a project where some luminaires have more power than what it is required by the mandatory provisions of exterior lighting power.
However the actual power necessary to...

Last reply: Julien Richard, Sep 13, 2016, 5:31 am