Topic | Recent |
---|---|
self servie seating area- glare controlNC-2009 IEQc8.1: Daylight and views - daylightposted by J Schütz on Feb 4, 2020, 10:09 am
Dear all, is for Option 2 Prescriptive a glare control needed for a seating area with self-service in a hotel, even if the VLT x... Last reply: J Schütz, Feb 12, 2020, 8:26 am |
|
GoO / green-e-standardNC-v4 EAc7: Green power and carbon offsetsposted by Hagen Bork on Feb 3, 2020, 8:41 am
Hi, I'm working in a project based in germany which is trying to achieve the credit for "Green power and carbon offsets". It's intended to buy electricity which is 100% renewable. The... Last reply: Marcus Sheffer, Feb 4, 2020, 2:40 pm |
|
Does private mean only residential?NC-v4 WEc2: Indoor water use reductionposted by Benjamin Weise on Jan 31, 2020, 11:09 am
There are different requirements lavatory faucets (Public vs. private (residential)). We are working on an office building that is not open to the public. The project designer is argueing that... Last reply: Benjamin Weise, Feb 3, 2020, 5:23 am |
|
Renewables outside LPB & owned by Project- Campus or no Campus?NC-v4 EAc5: Renewable energy productionposted by Anne Caminade on Dec 8, 2016, 6:50 am
Hi, We have a new small building on a large industrial site in Switzerland (same owner for the entire site) that we want to certify with LEED Gold (only the new small building) and we have no... Last reply: Marcus Sheffer, Dec 22, 2019, 4:51 pm |
|
Disturbed siteCS-v4 SSc3: Open spaceposted by Guillaume Rose on Dec 17, 2019, 1:54 pm
Hello, it is indicated that at least 30% of disturbed space... |
|
Major Renovation or EBOM?LEED Rating System Selectionposted by Christine Recke on Jun 24, 2019, 5:16 am
We intend to certify an existing office building which is going to be renovated with the following criteria:
Last reply: David Posada, Nov 27, 2019, 4:26 pm |
|
LEED project with laboratoriaLEED Rating System Selectionposted by Ydo Schuuring on Nov 14, 2019, 7:49 am
Hello, For a possible LEED v4.1 new construction project I need to determine which LEED scope is applicable. The project contains of offices and Laboratories. I can't find... Last reply: David Posada, Nov 14, 2019, 8:45 pm |
|
Lift Cycle AnalysisCS-v4 MRc1: Building life-cycle impact reductionposted by Guillaume Rose on Nov 8, 2019, 11:11 am
Hello, When i read the leed v4 referential, we see that for the life cycle analysis, only the products that are measured with surface calculation are taken into account in the calculation... |
|
Infra-red electronic basin mixerCS-v4 WEp2: Indoor water use reductionposted by Hatice G. on Oct 28, 2019, 7:59 am
Dear all, in our office project we will use public lavatory restroom faucets that has infrared sensors which detects hand movement. So water only runs when it’s needed. In this... Last reply: emily reese moody, Nov 6, 2019, 10:57 am |
|
FRANCE PROJECTPassive House Discussion Forumposted by Mélanie Bouchenez on Oct 11, 2019, 6:39 am
Hello, I work on LEED projects in France. The LEED repository specifies when the requirements can respect local standards. Is there a list of French local standards accepted by the USGBC... |