Log in
Forum » Asia – East
Topic

Low-Emitting Content Criteria for Wallcovering in EBOM v2009

EBOM-2009 MRc3: Sustainable purchasing - facility alterations and additions
posted by Noriko Nagazumi on Aug 9, 2016, 5:56 am

Do you have any idea for Low-Emitting Content (...

Last reply: Kimberly Schlaepfer, Aug 12, 2016, 2:34 pm

Ventilation and filteration for Staircase for Feature 64

WELL v1 Building Standard Tip Sheet
posted by Xinrong Zhao on Jul 25, 2016, 10:16 pm

Hello, Thank you Tristan for adding a WELL discussion to this site. My rpoject is an 18 floor residential project. The staircase is use for Fire exits. But to achieve the Feature 64, the accessor...

Last reply: Brian Salazar, Aug 10, 2016, 4:46 pm

parking area under cover

CI-2009 SSc3.3: Alternative transportation - parking availability
posted by ANNA SUN on Mar 15, 2016, 10:30 pm

my Project is in Shanghai China.I am preparing PI Form form my project. Now I have a question about parking area. our office located in a high rise building,we only rent one floor of this...

Last reply: Heather Walters, Aug 5, 2016, 1:44 pm

a question about DES option 1

CS-2009 EAc3: Enhanced Commissioning
posted by Shenhao Li on Jul 25, 2016, 7:51 am

Hello!
I have a question about EAc3 for...

Last reply: Scott Bowman, Jul 27, 2016, 7:23 pm

BOD and OPR

CI-v4 EAp1: Fundamental commissioning and verification
posted by Erin Rowe on Jul 18, 2016, 11:52 pm

Jareb Ketay Principal GHT Limited LEEDuser Premium Member 4 thumbs up July 19, 2016- 8:42 am Hello Erin, First thing's first.. and this probably sounds like a silly question given which part of the forum we're in.. but is this a LEED v4 project? I just want to confirm because the level of detail expected of a v4 project is going to be arguably greater than that of a v3 OPR/BOD. I think you're general assumption about the gist of an OPR is correct, though. I've worked on more than a few LEED projects (NC and CI), and the level of detail I've seen runs the gamut. There needs...

Last reply: Jareb Ketay, Jul 21, 2016, 10:10 am

Untenanted spaces with no lease agreements

CS-2009 IEQp1: Minimum indoor air quality performance
posted by John Mader on Jun 29, 2016, 3:53 am

We have a question about retail tenant spaces inside an office building. The owner will provide the retail spaces as cold shells for the retail tenants to fit out after the building is complete....

Last reply: John Mader, Jul 4, 2016, 10:55 pm

Confidential lease agreements cannot be obtained

CS-2009 IEQp1: Minimum indoor air quality performance
posted by John Mader on Jun 29, 2016, 3:50 am

Our project is an office building with some retail spaces on its lower floors that have already been leased. We are pursuing LEED CS v2009 and have made the first Design Submission and are now...

Replace All Filtration Media

EBOM-2009 IEQc1.5: Indoor air quality best management practices - indoor air quality management for facility additions and alterations
posted by Ran Zhang on Jun 14, 2016, 2:36 am

Hi I am working on a project located in Tokyo Japan. We are aiming to pursue IEQ c1.5 and thinking about the requirements regarding the filtration media replacement right now. As replacing all...

Last reply: Trista Brown, Jun 14, 2016, 3:02 pm

Chilled Beam System Energy Modeling- CS v2009

CS-2009 EAp2: Minimum Energy Performance
posted by Shenhao Li on May 6, 2016, 5:14 am

Hello Everyone,

I have an office project which is designed to use a little compicated HVAC system. There are 3 Central Heat Recovery Units on the roof top to provide pre-cooled/heated...

Last reply: Shenhao Li, May 10, 2016, 5:55 am

Non-direct Purchase Item

EBOM-2009 MRc1: Sustainable purchasing - ongoing consumables
posted by Ran Zhang on Apr 26, 2016, 2:15 am

The project I am working for does not pay for any toner cartridges as they are included in the maintenance contract. In this case, shall we count it zero or need to get the standard price if they...