Log in
Forum
Loading...
Topic

Any advantage over v4?

Schools-NC-v4.1 SSc5: Heat Island Reduction
posted by Chelsea Miller on May 3, 2019, 3:43 pm

Is there any advantage to replacing this specific LEED v4 credit with LEED v4.1? I thought I had read somewhere that Non-roof and Roof measures could be separated, so that one might obtain at...

green walls/vertical greenery

NC-2009 SSc5.2: Site development - maximize open space
posted by Pablo Fortunato Suarez on Nov 29, 2010, 5:08 am

My questions for green walls/vertical greenery:
1) Would "green walls*" or "vertical greenery*" qualify for credit point under this category?
2) If so how would computations be for...

Last reply: reham gamal, May 5, 2019, 6:11 am

Monitoring Based Cx in Specification

NC-v4 EAc1: Enhanced Commissioning
posted by Rachel Manoguerra on May 2, 2019, 5:12 pm

Our...

Last reply: David Hubka, May 3, 2019, 8:08 am

Building Envelope: does this requirement apply only for new envelope, or for existing also?

CI-v4 EAc2: Optimize Energy Performance
posted by Micaela Smulevich on May 2, 2019, 1:51 pm

We are working on a CI v4 project, that is three stories high. Client is looking into replacing some of the exterior windows. Not all windows would be in the scope of work. Our team needs an...

Last reply: Marcus Sheffer, May 2, 2019, 6:59 pm

Light Reflectance Values

CI-v4 EQc6: Interior lighting
posted by Casey Krieg on Dec 14, 2016, 2:09 pm

This credit references LRV's for furniture if it is included in the scope of work. In our instance it is and LEED breaks it down further to work surfaces and movable partitions. The question I...

Last reply: Sue Bryant, May 2, 2019, 3:42 pm

Any success with this credit yet?

Pilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysis
posted by Sophie Kerr on Oct 29, 2018, 4:11 pm

forum- There are only a few of us who have commented on this in the LEED User forum so my guess is not many have used this pilot credit it or it's been approved for others without participating in the forum. Log in or register to post comments ...

Last reply: Jill Kurtz, May 2, 2019, 12:39 pm

VOC Limit for opaque paints for wood.

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Suhas Kurikkal on May 1, 2019, 9:26 am

We have opaque flat paint to be applied for the decorative...

Last reply: Michelle Rosenberger, May 2, 2019, 12:10 pm

Calculator table

NC-v4 SSc4: Rainwater management
posted by Gracielli Monteiro on May 2, 2019, 10:02 am

we used combined...

MRc5 Option 2

NC-2009 MRc5: Regional Materials
posted by Richard Metts on May 1, 2019, 4:45 pm

Hello to All!

I'm trying to figure the following and see if I am understanding Option 2 of MRc5

Say I have an extraction point that is 500 miles from manufacturing and they ship by...

Last reply: Suhas Kurikkal, May 2, 2019, 1:59 am

Non-certified buildings in LEED boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by MERVE AYGENC on Jan 10, 2018, 7:01 am

Hi everyone,

The project area has two main buildings that just one of them will apply for LEED v 2009 - NC certification. They are totally separate buildings in terms of air-conditioning...

Last reply: Tristan Roberts, May 1, 2019, 11:49 pm