Log in
Forum
Loading...
Topic

Distribution of preferred parking on mixed-used buildings

NC-v4 LTc8: Green vehicles
posted by Sofia Barahona on Dec 20, 2019, 1:58 pm

Hi, we are working on a Core and Shell project which has mixed uses: offices and commercial. The project has 4 levels of underground parking, there are two levels assigned exclusively for the use...

Last reply: Dionisio Franca, Dec 22, 2019, 8:02 pm

Modeling Evaporative cooling systems (ambiator)

NC-2009 EAp2: Minimum Energy Performance
posted by Visu Boj on Sep 29, 2015, 3:26 am

Hi all,
Iam modelling ambiator for a factory building in India. My baseline system is Packaged...

Last reply: Marcus Sheffer, Dec 22, 2019, 5:24 pm

heat recovery in baseline

CS-2009 EAp2: Minimum Energy Performance
posted by Francesco Passerini on Aug 27, 2018, 6:30 am

I'm using  v2009_Minimum Energy Performance Calculator_v09.xlsm

In the tab "Air-Side HVAC" it specifies that energy recovery is required "For Baseline, any individual systems where supply...

Last reply: Marcus Sheffer, Dec 22, 2019, 5:22 pm

Regarding Solar PV System Selection

NC-v4 EAc5: Renewable energy production
posted by Mamun Ferdaus on Jul 10, 2018, 10:19 am

 Hi,
This is Mamun. We are having some problems with selecting Solar PV System. Is there any standard/baseline for selecting solar panel efficiency and inverter efficiency for LEED Project...

Last reply: Marcus Sheffer, Dec 22, 2019, 5:20 pm

AEDG Small/Medium Office Buildings- Building or Tenant Sf?

CI-v4 EAc2: Optimize Energy Performance
posted by RDK E&S on Dec 18, 2019, 11:54 am

Hello all, 

I'm working on a 20,000 sf fit-out project that is part of a 500,000 office building. The 50% AEDG Small/Medium Office Building includes buildings up to 100,000 sf. I wanted to...

Last reply: Marcus Sheffer, Dec 22, 2019, 5:18 pm

Receptacle Control Information documentation for ASHRAE 90.1-2010

CI-v4 EAp2: Minimum Energy Performance
posted by Leilanie Bruce on Dec 19, 2019, 9:24 pm

My project team received this comment and we are not sure how to address it. We have submitted a number of LEED-CI v4 projects and have never received this comment. Has anyone had this experience...

Last reply: Marcus Sheffer, Dec 22, 2019, 5:17 pm

Renewables outside LPB & owned by Project- Campus or no Campus?

NC-v4 EAc5: Renewable energy production
posted by Anne Caminade on Dec 8, 2016, 6:50 am

Hi, We have a new small building on a large industrial site in Switzerland (same owner for the entire site) that we want to certify with LEED Gold (only the new small building) and we have no...

Last reply: Marcus Sheffer, Dec 22, 2019, 4:51 pm

Solar Panels

NC-2009 EAc2: On-Site Renewable Energy
posted by PAULA HERNANDEZ on Jan 9, 2017, 8:35 am

Hello,
I am working on a Project that wants to claim all the available points on EA-c2. But they don´t have the space needed to place all the solar panels inside the LEED boundary.
...

Last reply: Marcus Sheffer, Dec 22, 2019, 4:50 pm

INNOVATION- PILOT CREDIT- Cooling tower water management

NC-v4 INc1: Innovation
posted by Maria Peralta on Jul 18, 2019, 11:05 am

Hello,

Im wondering about this possible pilot credit.

I am confused about the achievment of it, If my sistem doesn't have a cooling tower, it's means, that I can get the point and I...

Last reply: Lourdes Salinas, Dec 21, 2019, 9:12 am

ASHRAE Office Occupancy Schedule & Fan Control

CS-v4 EAp2: Minimum Energy Performance
posted by Cathal Heneghan on Dec 19, 2019, 4:38 am

Hi

I have a query regarding the ASHRAE Office Schedule. During normal occupancy hours the schedule is set to 95% occupancy, however our experience tells us that an 80% occupancy is typical...

Last reply: Tyler Thumma, Dec 20, 2019, 8:54 pm