Log in
Forum
Loading...
Topic

Green Power Five Year Contracts

NC-v4 EAc7: Green power and carbon offsets
posted by Sean Hogan on Feb 28, 2017, 7:14 am

I work for a corporate client seeking the...

Last reply: Heather Schrock, Jul 31, 2019, 12:41 pm

credit calculations for historic building

NC-2009 MRc1.1: Building reuse - maintain existing walls, floors and roof
posted by debra a. lombard on Oct 26, 2018, 10:40 am

https://leeduser.buildinggreen.com/forum/mr3-materials-reuse-and-mr4-recycled-content-double-dipping   "MRc3: Material Reuse  can involve material that is salvaged onsite and used again onsite for another purpose or in another location. The onsite  salvaged material  can count towards both...

Last reply: debra a. lombard, Jul 31, 2019, 11:27 am

Water splashing into my freezer with no ice maker.

LEED v4.1 Discussion Forum
posted by GeorgeMendes GeorgeMendes on Jul 31, 2019, 8:19 am

Bill Swanson Sr. Electrical Engineer, Feyen Zylstra LEEDuser Expert 684 thumbs up July 31, 2019- 10:06 am I think you have the wrong forum.   Log in or register to post comments ...

Last reply: Bill Swanson, Jul 31, 2019, 10:06 am

Partial credit with v4 substitution

NC-2009 SSc2: Development Density & Community Connectivity
posted by Cindy Quinn on Jul 30, 2019, 6:49 pm

We have a v2009 project that is within...

Last reply: Emily Purcell, Jul 31, 2019, 9:59 am

PCB Waste considered Hazardous Material, not to be tracked?

NC-2009 MRc2: Construction Waste Management
posted by William LaRose on Jul 30, 2019, 4:38 pm

I am tracking demolition waste from several structures that were removed to make room for my current LEED project. These structures contain several reports stating materials such as lead, PCBs,...

Last reply: debra a. lombard, Jul 31, 2019, 9:46 am

Prevention through Design- a Challenge for projects in Europe

Pilot-Credits IPpc93: Prevention through design
posted by Tobias Hutter on Jul 31, 2019, 4:45 am

Hello, we are trying to get this credit done for Projects over here in Europe, but it is very though for us to provide to the USGBC the reuired evidence because our Approach in Germany / Austria...

Prevention through Design- a Challenge for projects in Europe

Pilot-Credits IPpc93: Prevention through design
posted by Jens Glöggler on Jul 31, 2019, 5:26 am

Hello, has anybody done this Pilot Credit in Europe? would be glad to get more Information on how to submit this succesful? thank you, best regards 

Excluding entrance halls from calculations

Hospitality-NC-v4 EQc7: Daylight
posted by Ricardo Sá on Jul 31, 2019, 4:41 am

Dear All,

we are currently certifying an Hospitality project under LEED v4. Typically, the entrance halls of the living rooms are zones where occupancy is not expected (not...

Appliance and Process Water

Hospitality-NC-v4 WEc2: Indoor water use reduction
posted by Ricardo Sá on Jul 31, 2019, 4:24 am

Dear All,

we are currently certifying an Hospitality project under LEED v4. This project includes a laundry area accessible to all building occupants, where some washing machines...

Occupant Comfort Survey

NC-v4 INc1: Innovation
posted by Leanne Conrad on Aug 3, 2017, 4:01 pm

Is there a minimum duration after occupancy you must wait to conduct the occupant comfort survey? I want to submit the IN credit with the first construction submittal but don't want to have to...

Last reply: Stephanie Graham, Jul 30, 2019, 10:56 pm