Topic | Recent |
---|---|
Password and Zone Floor Area questionsNC-2009 IEQc8.1: Daylight and views - daylightposted by Gabriela Almquist on Dec 3, 2012, 4:14 pm
Hi, I'm trying to add a regularly occupied space (row) in the excel spreadsheet and it gives me an error message saying I do not have permission. Is there a way to add more spaces if I don't have... Last reply: Jill Dalglish, PE, Mar 8, 2013, 11:28 am |
|
MINIMUM IAQ AND FTENC-2009 IEQp1: Minimum indoor air quality performanceposted by Paula Hernandez on Mar 12, 2013, 9:46 amThe ASHRAE 62.1 occupancy (including diversity) should be within 10% of the project FTE. You should use the EAp2 forum to ask the question of whether or not the energy model needs to be within any percentage... Last reply: Julia Weatherby, Feb 4, 2014, 9:59 am |
|
Annual Weather Normalized Source Energy IntensityEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Stefanie Hoffmann on Jan 24, 2013, 8:57 am
Hi all, Last reply: Ravi Bajaj, Apr 2, 2013, 6:58 pm |
|
Including Gyms in Regularly Occupied SpacesSchools-2009 IEQc8.2: Daylight and views - viewsposted by Maya Karkour on Aug 18, 2010, 9:09 am
Dear all, LEED defines Regularly Occupied Spaces for schools as: Last reply: TODD REED, Sep 25, 2014, 3:00 pm |
|
Calculating Stormwater Treatment VolumesNC-v4 SSc4: Rainwater managementposted by Joshua Radoff on Jul 22, 2015, 11:40 pm
After going through the Online Reference Guide for this credit a few times, and then watching the two videos that illustrate how to calculate the various parameters (and feeling like I was... Last reply: Michael DeVuono, Sep 2, 2015, 9:03 am |
|
Automatic Receptacle ControlNC-v4 EAp2: Minimum Energy Performanceposted by Jan Hesse on Aug 7, 2015, 6:36 am
ASHRAE 90.1-2010 8.4.2 states, that 50% of all 125 volt 15- and 20-Ampere receptacle outlets in private offcies, open offices and computer classrooms shall be automatically switched off when the... Last reply: Marcus Sheffer, Mar 25, 2020, 11:58 am |
|
LEED v4 Interior Lighting Quality Option 2, Strategy ANC-v4 EQc6: Interior lightingposted by Kera Lagios on Jul 15, 2016, 6:27 pmSo far, we have not found a direct only fixture that meets this criteria. If anyone does find one, let the forum know! The best way around this is to use direct/indirect lighting or indirect only... Last reply: Catalyst Partners, Sep 30, 2019, 5:10 pm |
|
Non-certified buildings in LEED boundaryNC-v4 MPR2: Must use reasonable LEED boundariesposted by MERVE AYGENC on Jan 10, 2018, 7:01 am
Hi everyone, The project area has two main buildings that just one of them will apply for LEED v 2009 - NC certification. They are totally separate buildings in terms of air-conditioning... Last reply: Laura strauss, Sep 3, 2019, 5:16 pm |
|
Timing of Installation and CommissioningNC-v4 EAc5: Renewable energy productionposted by Michaella Wittmann on Jan 29, 2018, 11:22 am
The LEED Credit template for this credit indicates that the renewable installation has to be complete and commissioned prior to building occupancy. Are any exceptions made to this if the... Last reply: Deborah Lucking, Dec 9, 2019, 2:16 pm |
|
Recommened software for doing the Interior and Daylighting analyses.NC-v4 EQc7: Daylightposted by Jorng-ren Chern on Apr 10, 2018, 2:05 amrequirements for defining glazing visible transmittance (TVis) than documented for prior versions of Insight Lighting in the Forum. Default Revit materials are a very good start, but when you want to define very specific glazing performance, please refer to the Forum post here: https://forums.autodesk.com/t5/lighting-solar-analysis-forum/critical-up... Log in or register to post comments Zahra Mirian... Last reply: hj hjh, Jan 4, 2022, 7:29 am |