Pilot Credit: INpc113- Informing Design Using Triple Bottom Line Analysis

NC-v4 INc1: Innovation
posted by Sophie Kerr on Sep 24, 2018, 4:44 pm

Michelle Reott Managing Principal Earthly Ideas LLC LEEDuser Expert 624 thumbs up October 9, 2018- 12:36 pm Sophie - Your comment may have a better chance of being responded to if it is posted under the INpc113 forum-  https://leeduser.buildinggreen.com/node/add/forum?credit_id=4930&forum_id=4412&destination=forums. I hope other LEEDusers will share their experience. Log in or register to post comments ...

Last reply: Michelle Reott, Oct 9, 2018, 12:36 pm

Small Project BoD

CI-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Claire Cowling on Sep 24, 2018, 1:26 pm

I picked up a project in my firm after the first review was compelted. It seems that a BoD was never created for this project, as it is very small and the...

HPD v2.1- Statement about Special Conditions when "No" is indicated for Characterized, Screened, or Identified

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Ashley Hu on Mar 20, 2018, 7:30 pm

I’m currently reviewing a HPD v2.1 for LEED v4 Building Product Disclosure and Optimization – Material Ingredient Option 1.

Just about everything on this particular HPD meets the...

Last reply: Tristan Roberts, Sep 20, 2018, 10:57 am

Reclaim and use steam condensate requirement for indoor water use reduction

NC-v4 WEc2: Indoor water use reduction
posted by Elyse Dufrene on Sep 11, 2018, 7:52 am

Can you please clarify what is ment by the requirement for steam system : reclaim and use condensate  - 100% recovery and...

Last reply: emily reese moody, Sep 19, 2018, 6:30 pm

Finding an auditor

EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessment
posted by Sarah Radi on Sep 13, 2018, 3:58 pm

Hi,

Do any of you have a recommendation on where to find a 3rd-party...

DES boilers accountable for water metering

NC-v4 WEc4: Water metering
posted by Elyse Dufrene on Sep 11, 2018, 8:00 am

If...

Connectivity within a Big Box Store Shopping Centre

ND-v4 SLLc1: Preferred locations
posted by Tim Nabholz on Sep 7, 2018, 5:39 pm

What is considered an intersection within a parking lot of a Big Box Store shopping centre. There are a number of commuting roads intersecting between stores and there are many aisles of parking...

Last reply: Eliot Allen, Sep 10, 2018, 11:52 am

Does IT and AV equipment need to be installed prior to IAQ testing?

CI-v4 EQc4: Indoor air quality assessment
posted by Diana Smiciklas on Sep 7, 2018, 12:15 pm

Does IT and AV equipment need to be installed prior to...

Appendix G system type for addition

NC-2009 EAp2: Minimum Energy Performance
posted by Hilary Giffen on Sep 8, 2016, 4:55 pm

I have an addition to a manufacturing plant. The addition has its own HVAC system so the LEED boundary encompasses just the addition. The addition is 56,000 SF and the whole plant is somewhere...

Last reply: Marcus Sheffer, Sep 7, 2018, 12:09 pm

Lighting control for presentation in meeting room

NC-v4 EQc6: Interior lighting
posted by Elyse Dufrene on Aug 31, 2018, 10:01 am

LEED requirement says that Lighting for any presentation or projection wall must be separately controlled. Our project have small multiple meeting room where hanging on the wall TVs are...