EA Prerequisite 2

CI-2009 EAp2: Minimum Energy Performance
posted by Poorva Keskar on Feb 19, 2016, 1:37 am

In the Commercial Interiors project, the envelope and the base HVAC system is not in the scope of the interior project. HVAC for only a few cabins are in the scope. Please suggest the compliance...

Last reply: Marcus Sheffer, Feb 19, 2016, 11:10 am

Pump Room, STP Room & Guard Room Within LEED Boundary

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by Aswin M on Dec 31, 2015, 4:54 am

We have a factory project to be registered under LEED New Construction. The project has a Main building and additionally Pump room, STP room and a guard room which serves the need of the Main...

Last reply: Aswin M, Feb 5, 2016, 4:41 am

EA Cr 1.5

Retail-CI-v2009 EAc1.5: Optimize energy performance - building envelope
posted by balasubramaniam kg on Jan 29, 2016, 12:42 am

We have a retail commercial project in a leed certified building that is an air port. we want to know for the UA calculation only requires to use the project areas or all the building areas.

Idle energy rate for energy star equivalency calculations

CI-2009 EAc1.4: Optimize energy performance - equipment and appliances
posted by Shuchita Gupta on Jan 20, 2016, 8:30 am

Hi ,

We have an interior project specifying kitchen appliances like electric fryer , which are not energy star labelled so we are checking the equivalency for which we require idle rate...

Last reply: Shuchita Gupta, Jan 26, 2016, 8:09 am

Method to Achieve Thermal- Comfort for Ventilated Area

NC-2009 IEQc7.1: Thermal comfort - design
posted by SAMY Chamy on Aug 31, 2015, 4:15 am

Hai Everyone:-

Our project is sewing factory It is not fully conditioned (A/C & Ventilation)

1.A/c for Office area
2.Fans (Exhaust, Fresh air, HVLS fans) for Production...

Last reply: Christopher Schaffner, Jan 25, 2016, 10:44 am

Construction Activity and Pollution Prevention

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by JP Rout on Jan 22, 2016, 1:28 am

We have Project intending to be registered under LEED 2009 BD+C for major renovations. This is an existing building which will undergo major renovation work for the interiors, HVAC and a large...

Last reply: JP Rout, Jan 25, 2016, 4:13 am

Need Registration guidance for an upcoming Hospital campus

LEED Guidance for Campuses and Multiple Buildings
posted by Neha Singhal on Jan 14, 2016, 9:16 am

We have a Medical institution coming up at Faridabad (India), which contains various types of building, where the construction would be carried out simultaneously for all the blocks. The site...

Last reply: Jon Clifford, Jan 17, 2016, 11:51 am

Water Consumption Outside LEED Boundary

NC-2009 WEp1: Water Use Reduction
posted by Aswin M on Dec 24, 2015, 4:06 am

We have a garment factory project that has a Main block and two toilet blocks (separately for Men & Women).
The Main block has cutting & sewing sections only and the occupants of...

Last reply: Melissa Merryweather, Jan 3, 2016, 11:52 pm

Single Building Certification_LEED New Construction 2009

NC-2009 MPR2: Must be a complete, permanent building or space
posted by Aswin M on Dec 23, 2015, 5:42 am

We have a Garment factory project that has three blocks with connectivity bridge.
 The three blocks are namely Cutting block, Sewing block, and Fabric store block. The...

Last reply: Jon Clifford, Dec 30, 2015, 12:06 am

WE Credit 4.2: Cooling Tower Water Management- non potable

EBOM-2009 WEc4: Cooling Tower Water Management
posted by satheesh M on Nov 26, 2015, 3:51 am

The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned...

Last reply: Ben Stanley, Dec 1, 2015, 11:07 am