How can I develop leed certificate service in my country?

NC-v4 EQp1: Minimum indoor air quality performance
posted by erdem özkan on Jun 21, 2017, 3:10 am

We provide Leed certificate and green building service but how are we developing this process in Turkey?

VRV in Table 1.4

CS-2009 EAp2: Minimum Energy Performance
posted by Ghaith Moufarege on Jun 19, 2017, 3:51 am

Hello,

I am filling out the Table 1.4 for an office building with mutiple tenants, and each tenant has a separate VRV to serve their space.

On the "General HVAC" tab of Table 1.4 (...

Last reply: Marcus Sheffer, Jun 19, 2017, 9:37 am

Exterior lighting for group certification

NC-2009 SSc8: Light Pollution Reduction
posted by Mohamed M. Abd Elhameed on Mar 27, 2017, 6:19 pm

I am currently working on a project with multiple buildings within the LEED boundary. The project will follow group approach registration via campus guidance. Up to my understanding exterior...

Last reply: Bill Swanson, Jun 12, 2017, 11:13 am

LEED Group C&S- Applicable Cooling source in Propose case

CS-v4 EAp2: Minimum Energy Performance
posted by Ashraf Ali Khan Khan on Jun 8, 2017, 8:13 am

I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.

For LEED Group...

Last reply: Marcus Sheffer, Jun 9, 2017, 9:06 am

Applicable Cooling source in Propose case- LEED Group- v4 C&S

CS-2009 EAp2: Minimum Energy Performance
posted by Ashraf Ali Khan Khan on Jun 8, 2017, 7:29 am

I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.

For LEED Group...

Last reply: Marcus Sheffer, Jun 9, 2017, 9:06 am

Estimating the energy cost share of PV

NC-2009 EAc2: On-Site Renewable Energy
posted by Mohamed M. Abd Elhameed on Jun 6, 2017, 4:45 am

I am working on an industrial LEED project in KSA. Most of electrical loads are for the industrial processes itself (i.e production line), while the other remaining loads are for HVAC and...

Last reply: Marcus Sheffer, Jun 6, 2017, 11:58 am

Estimating the energy cost share of PV

NC-2009 EAc2: On-Site Renewable Energy
posted by Mohamed M. Abd Elhameed on Jun 6, 2017, 4:46 am

I am working on an industrial LEED project in KSA. Most of electrical loads are for the industrial processes itself (i.e production line), while the other remaining loads are for HVAC and...

DCV In Baseline

NC-2009 EAp2: Minimum Energy Performance
posted by VEL MUTHU on Jun 2, 2017, 8:21 am

Hi all,
Modelling DCV has been discussed many times in this forum. I gone through and understand quite a bit. I am listing my understanding along with some quires. Any response is much...

Last reply: Marcus Sheffer, Jun 2, 2017, 9:08 am

No 2-year, 24 hour design storm data available

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Mario S. on May 10, 2017, 2:54 am

The 2 year, 24-hour design storm precipitation data is unavailable for the country. However, Historic rainfall data exists.
Using that data, we will calculate the maximum runoff rate and...

Last reply: Mario S., May 12, 2017, 2:39 am

Separate Changing and Shower Rooms

CS-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Trina H on Apr 30, 2017, 7:54 am

Marilyn Specht Sr. Sustainability Consultant, Associate, Integral group LEEDuser Expert 46 thumbs up May 3, 2017- 12:37 pm Hi Trina, Who told you to do that? My understanding is they do not require the changing room to be separate from the shower area. This is also discussed in the LEED CI-2009 SSc3.2 forum where it is confirmed you do not need separate rooms for the two. Log in or register to post comments ...

Last reply: Marilyn Specht, May 3, 2017, 12:37 pm