Log in
Forum » LEED Rating System Selection
Loading...
Topic

Major Renovation prerequisites

LEED Rating System Selection
posted by Vanessa Poirier on Jan 30, 2017, 3:56 pm

Hi all,

In the case of a Major Renovation project, are all prerequisites must be answered (in all categories) or only the ones for the categories affected by the project. Example : if we...

Last reply: Nadav Malin, Jan 31, 2017, 11:40 am

High-rise Residences: NC or C&S?

LEED Rating System Selection
posted by Maria Isabel Conde on Aug 17, 2016, 12:35 pm

Hello,

We have a project that wants to pursue LEED v2009 certification. The building is mixed-use but mostly residential (2 levels will be for commercial use, 4 levels for office and...

Last reply: Tristan Roberts, Jan 15, 2017, 4:41 pm

Rating System Selection

LEED Rating System Selection
posted by Francis McNulty on Dec 7, 2016, 11:17 am

Hi, I have a project that is currently undergoing LEED certification for NC Major Renovation, with the certification due in the next two months. The project is now currently in the process of...

Last reply: Tristan Roberts, Jan 15, 2017, 2:22 pm

CI minimum scope of work?

LEED Rating System Selection
posted by Michael Smithing on Oct 28, 2016, 3:23 am

Is there a minimum scope of work to certify a project under LEED CI? I somehow remember a requirement that at least one room be unavailable for regular use for a minimum period of time (1 day?)...

Last reply: Tristan Roberts, Jan 15, 2017, 2:19 pm

Can LEED for New Construction be used for Ronald McDonald House

LEED Rating System Selection
posted by cathy keagle on Sep 1, 2016, 11:40 am

Our client is going to construct a two story Ronald McDonald House. The community where it where be built is zoned for Commercial MultiFamily Housing. The meter will be a commercial meter for...

Last reply: Tristan Roberts, Jan 15, 2017, 1:42 pm

Mixed Use Residential plus hotel V4 Version?

LEED Rating System Selection
posted by Beth Mosall on Oct 11, 2016, 12:40 pm

Project is on an urban site, 1.5 acres, brownfield, will be fully built out with a 2 level parking deck with retail on two sides, on top of which 3 buildings and a terrace garden will be built. 2...

Last reply: Beth Mosall, Oct 11, 2016, 2:44 pm

CI or NC?

LEED Rating System Selection
posted by FRAGKISKOS LEVANTIS on May 2, 2016, 1:03 pm

Dear all,
A client of mine is building a convention center and he will be operating it. Core and Shell works have been completed. However they are not well documented. Interior works will...

Last reply: Emmanuel Pauwels, Sep 30, 2016, 10:42 am

LEED Rating System for tenant in existing building

LEED Rating System Selection
posted by Jennifer Isaac on Jun 15, 2016, 10:08 pm

My client is a pharmaceutical facility that occupies part of the area of an existing building. The pharmaceutical facility space went into major renovations about 4 years ago and has been in...

O+M: Retail or ID+C: CI

LEED Rating System Selection
posted by Yulia Chen on Jun 14, 2016, 4:50 pm

Hi,

We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011.

Is it possible for us to go for Commercial Interior cert even though we missed...

C&S or NC?

LEED Rating System Selection
posted by Claire PIMET on Jun 10, 2016, 10:44 am

I’m contacting you regarding a project in the center of Paris. The client wants to go with a LEED certification on this project. The project is an existing building and the major refurbishment...