Log in
Forum
Loading...
Topic

Acoustic Performance

NC-v4.1 EQc9: Acoustic performance
posted by Kyle Roth on Mar 11, 2020, 11:12 am

Is this credit to require all of the...

Bonus for hyper-local sourcing

NC-v4.1 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Kim Shinn on May 23, 2019, 10:59 am

for that credit, either. Depending on the outcome of this discussion, I'll post something in the Forum for MRc4. Log in or register to post comments Summer Gorder Owner ecoREAL LEEDuser Basic Member 57 thumbs...

Last reply: Amanda Lang, Mar 11, 2020, 9:09 am

Track light power consumption

Retail-CI-v4 EAp2: Minimum Energy Performance
posted by Mahesh Shankar on Mar 11, 2020, 7:07 am

This one is a retail project in Thailand. The store has many tracklights due to which we are not able to get the required power savings in lighting. I know that installing current limiters for...

Last reply: Marcus Sheffer, Mar 11, 2020, 8:55 am

Sunset date and timelines

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by suveera kakkar on Nov 15, 2017, 4:21 am

Hello

I am working on a CS-2009 project with precertification and split review. As the sunset date is set for June30, 2021 we are trying to set timeline for the submissions. As per my...

Last reply: Danna Richey, Mar 10, 2020, 5:13 pm

LEED v4.1 makes changes for commingled waste in Option 1- What do you think?

NC-v4 MRc5: Construction and demolition waste management
posted by Michelle Reott on Jan 23, 2019, 3:21 pm

I'm hopeful that everyone on this forum has seen the BD+C LEED v4.1 new language for MRc5 regarding...

Last reply: Nathan Gauthier, Mar 10, 2020, 4:40 pm

Submitting evidence in design or post-construction stage

NC-v4 EQc9: Acoustic performance
posted by Isabel Santos on Mar 10, 2020, 1:35 pm

Hi,

We are in the process of replying to a LEED Certification Review – split review, design stage – of a building which is now close to completion.

We have received a comment...

4.1 credit substitution documents

NC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Lissa Spitz on Mar 10, 2020, 11:12 am

Hi, what are the LEED v4.1 credit substitution documents that need to be uploaded? Just the 4.1 BPDO calculator?

Last reply: Lissa Spitz, Mar 10, 2020, 11:48 am

Long Term Bike Storage- Distance to Building Entry

NC-v4 LTc6: Bicycle facilities
posted by Catherine Blakemore on Mar 3, 2020, 10:13 am

I this question on the v4.1 forum, but have received an answer and am hoping for better results on the v4.0 forum.

Is the distance from building entry to the long term storage...

Last reply: Marilyn Specht, Mar 10, 2020, 11:33 am

Bike parking in the basement

CS-v4 LTc6: Bicycle facilities
posted by Guillaume Rose on Feb 28, 2020, 5:15 am

Hello,

Could you tell me if it is possible to have bicycle parking in the 2nd basement with an elevator dedicated to bikes?
Note that there will also be a bicycle parking on the...

Last reply: Marilyn Specht, Mar 10, 2020, 11:30 am

Long Term Bike Storage- Distance to Building Entry

NC-v4.1 LTc6: Bicycle facilities
posted by Catherine Blakemore on Feb 26, 2020, 9:15 am

Is the 300 foot distance a radial distance from building entrance or based on...

Last reply: Marilyn Specht, Mar 10, 2020, 11:29 am