Log in
Forum
Topic

INpc136

Pilot-Credits INpc136: Safety First: Re-Enter Your Workspace
posted by Agnes Vorbrodt on Aug 20, 2020, 5:56 pm

My Client found the AIA document very helpful in learning about global best practices in preventing COVIC infection at her building. Daily surveys: the requirement for management was aligned with...

Last reply: Gurneet Singh, Apr 20, 2021, 10:13 am

Off Gassing

LEED Canada Forum
posted by Darryl Chrenek on Apr 20, 2021, 10:00 am

If we had to use a subfloor adhesive that was 160gl and not our normal 100gl that is followed by 3 layers of materials(plywood, underlayment and marmollium flooring) how long would it need to off...

Compromise between Dust Control by Watering & Water Consumption

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Abdulrahman Sherazy on Apr 9, 2012, 3:04 am

The best way I experienced in dust control measures in construction roads is to cover these roads by crushed stone, compact it by the compactor, and finally water it frequently. This reduces dust...

Last reply: Gordon Allen, Apr 20, 2021, 3:47 am

Mandatory to comply with ASHRAE 90.1 2010 Section 9.4.1 for Lighting Control?

CI-v4 EAp2: Minimum Energy Performance
posted by shashank gangil on Apr 19, 2021, 2:16 am

We recently received the review result of a LEED v4 Commercial Interior Project. The reviewer is asking for proof whether all mandatory requirements of section 9.4.1 for lighting control have...

Last reply: shashank gangil, Apr 19, 2021, 11:43 pm

Working through COVID-19

Working through COVID-19
posted by Paula Melton on Apr 9, 2020, 3:00 pm

Are you having trouble working from home? Worried about your submittals going in on time? Concerned that you can't conduct a charrette?

Welcome to our COVID-19 discussion forum. Feel free...

Last reply: Pawan Kumar, Apr 19, 2021, 11:02 pm

Experiences with pursuing the Daylight in nonregularly occupied spaces pilot credit?

Pilot-Credits EQpc116: Daylight in nonregularly occupied spaces
posted by Christopher Hoeh on Mar 2, 2020, 5:27 am

I'm somewhat surprised by the lack of posts for this topic.  We found it matched up nicely with our...

Last reply: Maryanne Welton, Apr 19, 2021, 5:35 pm

ACP

Homes-v4 EQp4: Radon-resistant construction
posted by Gustavo De las Heras Izquierdo on Mar 8, 2018, 12:39 pm

Hallo,

Many countries do not have mapped radon levels as accurately as EPA requires. Can countries marked in orange and green in the following study be considered as "out of EPA zone 1"?...

Last reply: Roshni Lad, Apr 19, 2021, 2:03 pm

LZ3- Glare exemption

NC-v4 SSc6: Light Pollution Reduction
posted by on Apr 15, 2021, 8:19 pm

Hello, 

I have a question regarding glare ratings for open air showrooms. 

I have a project which has open air display/showroom for cars. The project is a part of a campus and lies...

Last reply: Glenn Heinmiller, Apr 19, 2021, 11:58 am

Whole Building Meters

NC-v4 EAc3: Advanced Energy Metering
posted by David Hubka on Apr 15, 2021, 2:12 pm

I think whole building meters must also meet the Advanced Metering requirements per the Requirements section of the reference guide however the rest of the reference guide, credit template, and...

Last reply: Marcus Sheffer, Apr 16, 2021, 9:00 pm

If sub-ing all NC-v4.1 for MR credits, then is NCv4-MRp2 still required if registered as v4?

NC-v4 MRp2: Construction and demolition waste management planning
posted by Laura Stanley on Apr 15, 2021, 5:26 pm

Has anyone encountered this situation, and been allowed to skip the MRp2 credit since it was omitted in NC-v4.1 in 11/2020?

I haven't had any luck finding info for this particular...

Last reply: David Hubka, Apr 16, 2021, 4:12 pm