Log in
Forum
Loading...
Topic

Project site with a road without pedestrian paving

NC-v4 LTc4: Surrounding density and diverse uses
posted by Reshadee Weerasooriya on Sep 2, 2019, 2:13 am

Hi all,

We have a project (Non US) that is located in a previously developed site in a very dense urban area. However the road that connects the project site is a very small road that has...

Last reply: Reshadee Weerasooriya, Sep 4, 2019, 11:08 pm

Indoor Water Use Reduction Calculator v4.0

NC-v4.1 WEp2: Indoor water use reduction
posted by Dung Bui on Sep 4, 2019, 11:05 pm

Hi everyone,

I'm currently working on the credit Indoor Water Use Reduction (Calculator 4.0 excel sheet) and have a question concerning fixture's design flow rate.

The fixtures used...

MR BPD&O Calculator v4.1

NC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Agata Mozer on Apr 15, 2019, 7:50 am

Hello,

I would like to replace the v4 credit with v4.1 equivalent and track the credit status via appropriate calculator. Could you tell me where can I find the right editable document?...

Last reply: Joseph Snider, Sep 4, 2019, 6:39 pm

Energy Star Target Finder in New Property Use in New Building

CI-v4 EAp2: Minimum Energy Performance
posted by Kena David on Sep 4, 2019, 12:56 pm

Our project is pursuing LEEDv4 EA Minimum Energy Performance Option 2 in a new commercial office space in a new building. The building finished construction this year, and our office spaces will...

Last reply: Kena David , Sep 4, 2019, 4:50 pm

Documenting ID credits

NC-v4 INc1: Innovation
posted by Leilanie Bruce on Apr 25, 2017, 3:56 pm

a better idea of specifics. Too bad we can't post images on these forum pages. Anyone else on here have a more recently registered Campus project and can advise? Log in or register to post comments ...

Last reply: emily reese moody, Sep 4, 2019, 12:56 pm

Adding wings to a non-certified building

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Mario S. on Sep 4, 2019, 9:10 am

We have a case of an existing hospital building, and the owner now wishes to add 2 wings to it; one on its west side and the other on its east.

In terms of physical connection, the 2 wings...

Last reply: Tristan Roberts, Sep 4, 2019, 10:35 am

NC-2009 MRc5p regional Materials

NC-2009 MRc5: Regional Materials
posted by Sayali G on Sep 3, 2019, 2:15 pm

Hello All,

This is my first time handling the LEED documentation, and I am stuck with one part in the calculator for Regional Credit.

In the calculator for regional materials...

Is Manual Measurement acceptable?

NC-2009 EAc5: Measurement and Verification
posted by Summer on Sep 2, 2019, 8:44 am

I would like to clarify if manual measurement is acceptable and compliant in this credit. We have a project that has BMS or building management system that can only monitors the HVAC consumption...

Last reply: Summer, Sep 3, 2019, 8:10 pm

LEED v4 Interior Lighting Quality Option 2, Strategy A

NC-v4 EQc6: Interior lighting
posted by Kera Lagios on Jul 15, 2016, 6:27 pm

that meets this criteria. If anyone does find one, let the forum know! The best way around this is to use direct/indirect lighting or indirect only lighting. It's a little unclear in the LEED Guide,...

Last reply: Chris Lopez, Sep 3, 2019, 6:50 pm

Non-certified buildings in LEED boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by MERVE AYGENC on Jan 10, 2018, 7:01 am

Hi everyone,

The project area has two main buildings that just one of them will apply for LEED v 2009 - NC certification. They are totally separate buildings in terms of air-conditioning...

Last reply: Laura strauss, Sep 3, 2019, 5:16 pm