Topic | Recent |
---|---|
Financial support for other organizationsPilot-Credits SSpc83: Offsite Financial Support for Habitat Protectionposted by Dan Ackerstein on Oct 16, 2017, 5:22 am
Is there precedent for achieving this credit with financial support for organizations other than NFWF or Amazonas Sustainable Foundation (FAS)? There are many well-respected land trusts making... Last reply: Jennifer Atherton, Apr 1, 2024, 4:42 pm |
|
Storage of Chemicals to avoid Cross-contamination in LabsNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Joyce Kelly on Feb 27, 2018, 7:37 pm
I'm recommending that chemicals delivered to Labs should be stored in vented Chem. cabinets with 0.5cfm psf to create neg. pressure with respect to the rest of the Lab. Then, chemicals in use are... Last reply: Grace Heraly, Apr 1, 2024, 2:14 pm |
|
Difficult Development Areas and Poverty Rate QualifiedCS-v4 LTc3: High priority siteposted by Hetvi Vora on Jun 14, 2023, 12:58 pm
Does a site that falls under the DDA areas need to be poverty rate qualified in order for me to achieve the priority designation credit under High Priority Site? Last reply: Afogreen Build, Apr 1, 2024, 2:59 am |
|
Design Review vs Construction ReviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Todd Bundren on Dec 11, 2012, 12:54 pm
My project pursued a split review. Some of the deisgn review comments indicated they want proof the items we indicated in a narrative were completed, this proof can't be given until it is built... Last reply: Richmond General Contractors, Mar 29, 2024, 2:56 pm |
|
Deep Soil mixing activityNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Summer Gorder on Mar 29, 2024, 2:46 pm
Does deep soil mixing activity fall under 31.60 Foundations? |
|
Industrial or non-regular process loadNC-v4 EAp2: Minimum Energy Performanceposted by Charalampos Giannikopoulos on Nov 16, 2016, 8:52 am
For a facilities with increased process load (more than 60%), other than data centers, including but not limited to industrial facilities, is there a particular guidance in establishing a... Last reply: Farooq Saeed, Mar 29, 2024, 1:40 am |
|
Parking spacesNC-v4 LTc7: Reduced parking footprintposted by David O'Connell on Mar 28, 2024, 5:13 am
Hi All, Working on a project that is part of larger campus it is only a single building that is being certified. There is a seperate parking lot where there is no plan on designing new... Last reply: Gioia Connell, Mar 28, 2024, 3:01 pm |
|
Percentage of occupancy for the Indoor Water Use Reduction Calculator for the prerequisite- project only has ADA restrooms.CI-v4 WEp1: Indoor water use reductionposted by Laura Castro Montoya on Mar 27, 2024, 7:39 pm
Currently, I am conducting certification for an office project, in the commercial interiors mode, which only has ADA restrooms within the LEED boundary. The majority (95%) of users will be using... |
|
Exceptional calculation method application.NC-2009 EAp2: Minimum Energy Performanceposted by FABIO VIERO on Jun 8, 2015, 4:07 am
Under ASHRAE 90.1 – G2.5, can we avoid to use a workaround to detail a HVAC system feature which could involve an energy saving, therefore avoid to do an exceptional calculation method, if we... Last reply: Marcus Sheffer, Mar 28, 2024, 10:00 am |
|
Strategy #4- Filtration of Recirculated AirNC-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Dave Hubka on Nov 22, 2021, 8:28 am
I wonder what... Last reply: Farooq Saeed, Mar 28, 2024, 5:38 am |