Requerimiento horario

Retail-NC-v4 SSc6: Light Pollution Reduction
posted by Jorge Adalberto Bernal Segovia on Jun 18, 2020, 4:57 pm

Existe algún requerimiento horario para el apagado y encendido de luces exteriores?

Es decir si solo a inicios de la noche la iluminación exterior esta encendida, y luego la misma se apaga...

Last reply: Jorge Adalberto Bernal Segovia, Jun 19, 2020, 9:53 am

AEDG Calculator Needed When Base Building Systems Weren't Modified or Contributing to Savings?

CI-v4 EAc2: Optimize Energy Performance
posted by Gera Feigon on Jun 18, 2020, 10:47 pm

I have a small office fit-out project that is pursuing Option 2 (prescriptive) for Optimize Energy Performance. The...

Last reply: Marcus Sheffer, Jun 19, 2020, 9:38 am

Play area excluded from calculations?

NC-v4.1 SSc4: Rainwater management
posted by Maddie Spinski on Jun 19, 2020, 9:26 am

We are building an early childhood education center next to the existing elementary school. Can we exclude the play area and existing parking lot that we are only adding one space to? We aren’t...

C&S or NC: New Building with leased Office Space but occupied 80-90% by one tenant at completion

LEED Rating System Selection
posted by Jessica Kavanagh on Jun 18, 2020, 12:36 pm

Core & Shell vs New Construction:

In a situation where a new building is being constructed by a developer/landlord and the incoming tenant will be signing a lease with that entity, is...

Tenants using energy supplier meters

CS-v4 EAc3: Advanced Energy Metering
posted by Ricardo Sá on Jun 18, 2020, 4:07 am

Dear All,

We are currently certifying a large office building using LEED v4 BD+C Core & Shell.

The...

Last reply: Marcus Sheffer, Jun 18, 2020, 12:15 pm

Tolerance within the achievement of criterias due to different affectations

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Audrey LEDESERT on Jun 18, 2020, 4:37 am

Hi,

I'm working on a project with administration affectation and some commercial surfaces on the groundfloor (surface < 40% of the total project surfaces).

As the commercials...

Landscaping lighting

LEED v4.1 Discussion Forum
posted by Davide Liviero on Jun 18, 2020, 8:59 am

Hello everyone,

I am modeling an office building and i am encountering problems with the exterior lighting. I have two lights for the green area just outside of the office. I suppose I...

Definition of Short term and Long Term bike storage

NC-v4 LTc6: Bicycle facilities
posted by Martin Stowell on Jan 6, 2016, 12:00 pm

How does LEED define short term and long term bike storage? What are some examples of each? This is for a NCV4 Core and Shell project. Thanks.

Last reply: Summer Minchew, Jun 18, 2020, 7:46 am

Waste audit

EBOM-v4.1 MRp3: Waste Performance
posted by Jorge López de Obeso on Dec 18, 2019, 1:16 pm

Hello everyone.

We have a hotel project that is inside a core and shell LEED Certified building.

The hotel has been operating for a few years so information regarding energy and...

Last reply: Eric Bautista, Jun 18, 2020, 6:33 am

Standard supply pressure is different than the LEED baseline supply pressure

NC-v4.1 WEp2: Indoor water use reduction
posted by Isabel Santos on Jun 18, 2020, 5:32 am

Dear all

About this statement:

"Projects located where standard supply pressure is different than the LEED baseline supply pressure may calculate the water consumption of flow...

Last reply: Isabel Santos, Jun 18, 2020, 6:11 am