Walk off mats for skyway entranceNC-v4 EQc1: Enhanced indoor air quality strategiesposted by SIG - Sustainability Main Account on Mar 22, 2024, 2:34 pm
Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "... Last reply: Talia Mamayek, Mar 22, 2024, 4:16 pm |
|
Buildings within site but not under LEED scopeNC-v4 EQp2: Environmental tobacco smoke controlposted by Marwa Elzoghby on Mar 22, 2024, 10:44 am
I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope. Given their proximity to the LEED boundary, I am wondering whether it's necessary to... |
|
Overall Feedback on Pilot CreditPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Kavita Karmarkar on Mar 21, 2024, 5:32 pm
As our project is located in Northern CA, it is not diffidult to achieve this credit as there are many haulers with third-party certified diversion rates (RCI) in the area. They may not be lowest... |
|
Gross Floor AreaCI-v4 MPR3: Must comply with project size requirementsposted by Edgar Arevalo on Mar 21, 2024, 3:09 pm
For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage. Since... |
|
What if Question- Bathroom removed from scope, how to comply with WEp1?CI-v4 WEp1: Indoor water use reductionposted by Edgar Arevalo on Mar 21, 2024, 2:57 pm
How would a project comply with WEp1 if the bathroom was removed from scope. This is a interior fit out of part of a floor, and the common restrooms shared by the project space and the rest of... Last reply: Edgar Arevalo, Mar 22, 2024, 4:20 pm |
|
Exterior Illuminated SignageEBOM-v4 MRc2: Purchasing - lampsposted by Kristina K on Mar 21, 2024, 11:37 am
Hello, Does this credit apply to Exterior Illuminated Signage? Thank you |
|
Total Material CostLEED v4.1 Discussion Forumposted by Arda Buyuklu on Mar 21, 2024, 10:49 am
Why is providing Total Material Cost required/necessary when completing a LEED v4.1 Materials Reporting Form? How is this relevant for LEED purposes, especially if it is almost always subject to... |
|
Peak Shaving StrategiesNC-v4 EAp2: Minimum Energy Performanceposted by Dave Hubka on Mar 18, 2024, 1:06 pm
The energy used by electric vehichle charging stations within the LEED Project Boundary is not included within the eneryg model. I am wondering, if electric vehicle charging was 'locked out'... Last reply: Dave Hubka, Mar 18, 2024, 2:02 pm |
|
"7% for green vehicles "NC-v4 LTc8: Green vehiclesposted by Santiago Avila on Mar 18, 2024, 10:53 am
"LT Credit Reduced Parking Footprint. Project teams also pursuing the related credit must reserve 12% of total parking capacity for preferred vehicles (with a required 7% for... Last reply: Santiago Avila, Mar 19, 2024, 5:21 am |
|
Inclusion of Process Waste in Waste Performance CalculationEBOM-v4.1 MRp3: Waste Performanceposted by Subhashkumar A on Mar 16, 2024, 6:44 am
Hello, Our project building is a garment building, and its final product is dresses. It generates fabric waste during the production process, inherent to the nature of the production... |