Walk off mats for skyway entrance

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by SIG - Sustainability Main Account on Mar 22, 2024, 2:34 pm

Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "...

Last reply: Talia Mamayek, Mar 22, 2024, 4:16 pm

Buildings within site but not under LEED scope

NC-v4 EQp2: Environmental tobacco smoke control
posted by Marwa Elzoghby on Mar 22, 2024, 10:44 am

I have a project where the driver room and canteen, situated at the main gate, are not part of the LEED scope. Given their proximity to the LEED boundary, I am wondering whether it's necessary to...

Overall Feedback on Pilot Credit

Pilot-Credits MRpc87: Verified Construction & Demolition Recycling Rates
posted by Kavita Karmarkar on Mar 21, 2024, 5:32 pm

As our project is located in Northern CA, it is not diffidult to achieve this credit as there are many haulers with third-party certified diversion rates (RCI) in the area. They may not be lowest...

Gross Floor Area

CI-v4 MPR3: Must comply with project size requirements
posted by Edgar Arevalo on Mar 21, 2024, 3:09 pm

For a LEED Commercial Interior fit-out project, when we are registering the project in LEED Online it asks for the gross square footage.  Since...

What if Question- Bathroom removed from scope, how to comply with WEp1?

CI-v4 WEp1: Indoor water use reduction
posted by Edgar Arevalo on Mar 21, 2024, 2:57 pm

How would a project comply with WEp1 if the bathroom was removed from scope.  This is a interior fit out of part of a floor, and the common restrooms shared by the project space and the rest of...

Last reply: Edgar Arevalo, Mar 22, 2024, 4:20 pm

Exterior Illuminated Signage

EBOM-v4 MRc2: Purchasing - lamps
posted by Kristina K on Mar 21, 2024, 11:37 am

Hello,

Does this credit apply to Exterior Illuminated Signage?

Thank you

Total Material Cost

LEED v4.1 Discussion Forum
posted by Arda Buyuklu on Mar 21, 2024, 10:49 am

Why is providing Total Material Cost required/necessary when completing a LEED v4.1 Materials Reporting Form? How is this relevant for LEED purposes, especially if it is almost always subject to...

Peak Shaving Strategies

NC-v4 EAp2: Minimum Energy Performance
posted by Dave Hubka on Mar 18, 2024, 1:06 pm

The energy used by electric vehichle charging stations within the LEED Project Boundary is not included within the eneryg model. I am wondering, if electric vehicle charging was 'locked out'...

Last reply: Dave Hubka, Mar 18, 2024, 2:02 pm

"7% for green vehicles "

NC-v4 LTc8: Green vehicles
posted by Santiago Avila on Mar 18, 2024, 10:53 am

"LT Credit Reduced Parking Footprint. Project teams also pursuing the related credit must reserve 12% of total parking capacity for preferred vehicles (with a required 7% for...

Last reply: Santiago Avila, Mar 19, 2024, 5:21 am

Inclusion of Process Waste in Waste Performance Calculation

EBOM-v4.1 MRp3: Waste Performance
posted by Subhashkumar A on Mar 16, 2024, 6:44 am

Hello,

Our project building is a garment building, and its final product is dresses. It generates fabric waste during the production process, inherent to the nature of the production...