Forum » NC-2009 IEQc3.2
Topic

Is 4,300 = 4,500?

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Lewis Hewton on May 3, 2018, 8:36 pm

Has anybody else noticed the LEED submission form for IEQc3.2 converts 14,000 cf/sf to 4,500m3/m2. They seem to have rounded up to the nearest 500 when a more appropriate conversion would be 4,...

Last reply: Lewis Hewton, May 7, 2018, 7:08 pm

Area not in scope of project

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Carl Rappa on Apr 9, 2018, 4:15 pm

We have a renovation & addition project where the CM wants to do the Option 2: Air Testing to achieve IEQc3.2. A portion of the existing building (an old theatre) was outside of the scope of...

IEQ 3.2 NC-V2009

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Peter Del Sette, Jr on Dec 23, 2017, 12:50 pm

I will be using Option Two for IEQ 3.2 NC V2009 in a ~70,000 sf office building that has ten floors (~7,000 sf per floor) all serviced by one rooftop unit. I'm thinking that I will have...

Last reply: Dale Walsh, Dec 26, 2017, 1:05 pm

IAQ testing in a new addition

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Shawn Keith on Oct 5, 2017, 6:42 pm

We have chosen to perform...

Last reply: Dale Walsh, Oct 5, 2017, 7:03 pm

IAQ testing in a new addition

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Shawn Keith on Oct 5, 2017, 6:13 pm

We are have chosen to perform...

Implementing IAQ testing shell space

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Summer Minchew on Aug 1, 2017, 3:55 pm

Noting that an equivalent to IEQc3.2 is not available within the LEED-CS rating system, is it safe to assume that future tenant space(s) within a LEED-NC project would not be subject to...

Last reply: Tom Nichols, Aug 1, 2017, 6:59 pm

Residential Flush out Requirements

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Rachel Manoguerra on Mar 29, 2017, 12:08 pm

I've seen two other people ask this question, but can't find that it's been answered. So sorry, if I'm asking an already answered question. What are the requirements/procedures for doing a flush...

Air testing related to partial renovation per floor

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Julie Barth on Mar 9, 2017, 6:21 pm

I have a client who is asking about air testing for an office building renovation project where small parts of each floor will be renovated. The building has 8 floors with north and south...

Last reply: Dale Walsh, Mar 10, 2017, 7:44 pm

Flush out for 1 storey high bay warehouse

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Renaud Gay on Feb 27, 2017, 3:52 am

Hello,

We have a 1 storey 30m high...

Flush out by AHU volume or Floor volume?

NC-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Aru Sau on Feb 16, 2017, 9:37 am

In this project, there are three floors ( with multiple rooms with interior walls with doors) with multiple AHUs serving from 100% OA intake to 20% OA intake.
For the Flush Out time,
...