SS Cr 2 1/2 mile radius

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Elena Gonzi on Jul 14, 2015, 4:54 am

2015- 10:53 pm This forum addresses LEED-NC MRp1 Storage & Collection of Recyclables. See LEEDuser’s Development Density & Community Connectivity forums for LEED-NC (http://www.leeduser.com/credit/NC-2009/SSc2) & LEED-CI (http://www.leeduser.com/credit/CI-2009/SSc2) for guidance concerning SSc2. If you still have questions, the experts on those forums should be able to help. Also, please note...

Last reply: Jon Clifford, Jul 15, 2015, 10:53 pm

Material and Resources Collection Area

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Elena Gonzi on Jul 13, 2015, 3:49 am

Good Morning,
We have a question about the area of storage. We have an area with 4 buildings. Each building has a separate certification. The storage area, according to our opinion, has to...

Last reply: Jon Clifford, Jul 13, 2015, 10:27 pm

high rise residential building collect of recyclables

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Tarek Dalati on May 6, 2010, 1:12 am

i m working on a 50 floor residential high rise building i im finding a problem in finding a way to allow for the segregation of teh recyclables so.i m thinking of providing a garbage room on...

Last reply: Gustavo De las Heras Izquierdo, May 21, 2015, 11:20 am

Calculating Waste

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Caroline O'Leary on Aug 11, 2014, 11:10 pm

Approximately a year ago, we documented this credit for a small 3,000 sf (give or take) bank branch. The reviewer required we collect the waste from an average 24 hour period, sort the waste,...

Last reply: Jon Clifford, Aug 28, 2014, 8:36 am

"Access to Occupants"

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Omar Elrawy on Aug 18, 2014, 8:46 am

Dear All,
I have a 6 story office building with one garbage shoot linked to a garbage sorting room outside the building but within the LEED project boundary. I was intending to...

Last reply: Jon Clifford, Aug 18, 2014, 2:14 pm

Storage area for Group Certification

NC-2009 MRp1: Storage and Collection of Recyclables
posted by FABIO VIERO on Apr 22, 2014, 7:30 am

Hi,
I'm now working on a Group Project certification under LEED 2009 NC.
The Group is made of 3 separate buildings with a common basement dedicated to parking use.
We're...

Last reply: Tristan Roberts, Jul 25, 2014, 12:12 am

How strictly is the "accessible location" interpreted?

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Christina Nguyen on Feb 19, 2014, 8:35 am

We have a 3-story classroom building for a community college. We originally designated a portion of the main mechanical room on the ground floor as the building recycling collection and storage...

Last reply: Tristan Roberts, Jul 25, 2014, 12:10 am

recycle storage room exhausted?

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Carrie Laurendine on Nov 11, 2013, 12:14 pm

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11474 thumbs up December 20, 2013- 3:42 pm Michael, please post this question under our IEQc5 forum. Log in or register to post comments ...

Last reply: Tristan Roberts, Dec 20, 2013, 3:42 pm

Calculation of the required area

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Magda Aghababyan on Dec 9, 2013, 1:22 am

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11474 thumbs up December 20, 2013- 3:41 pm Magda, you do need to provide space adequate for the designated waste types stated in the LEED requirements, even if you don't think you will be producing them.However, you do have discretion in allocating space. For guidance, I would recommend reading LEEDuser's guidance above, and reviewing the forum here. Log in or register to post comments ...

Last reply: Tristan Roberts, Dec 20, 2013, 3:41 pm

Separate Buildings, Same Cellar

NC-2009 MRp1: Storage and Collection of Recyclables
posted by Jesus Deras on May 5, 2013, 10:12 am

I have two hotel projects(190K & 98K) which will be filed as two separate LEED projects that have a combined cellar. As per reference guide sizing guideline, do I have to provide two...