Log in
Forum » NC-2009 PIf3
Topic

Theater and Retail Occupancy

NC-2009 PIf3: Occupant and Usage Data
posted by Summer on Aug 6, 2018, 2:25 am

Hello,

I have a Theater project that has a retail space operating 24/7 on the side of the building. I was wondering how to compute the occupancy of the retail since one of their transient...

Preschool Occupancy

NC-2009 PIf3: Occupant and Usage Data
posted by Heather Holdridge on Apr 12, 2018, 11:35 am

I received a preliminary design phase review comment on a preschool project for this PI form.  We entered identical values for the peak and average transient occupancy because the building is...

Last reply: David Posada, Apr 12, 2018, 6:16 pm

Occupants for Multi-purpose Hall and Canteen

NC-2009 PIf3: Occupant and Usage Data
posted by Sjansie Lachica on Apr 6, 2018, 1:45 am

My project is a mixed-use building which consist a whole floor assigned as multi-purpose hall and another floor as canteen. Do we need to determine the number of occupants in multi-purpose hall?...

Last reply: Summer Minchew, Apr 11, 2018, 8:49 am

Regularly Occupied Area- Kitchen Countertops and Islands

NC-2009 PIf3: Occupant and Usage Data
posted by Rose Winter on Mar 20, 2018, 2:27 pm

I know that residential kitchens are considered regularly occupied. However, one thing that doesn't always get consistently documented is how the area of the kitchen that is in an open floor plan...

Last reply: Rose Winter, Mar 21, 2018, 4:04 pm

NC-2009 PIf3- Occupant and Usage Data

NC-2009 PIf3: Occupant and Usage Data
posted by Felicia Ridgeway on Mar 13, 2018, 11:27 am

My new construction administrative office building project (federal project on a secure military base) has 750 full-time occupants (8 hour work day), 300 part-time occupants (4 hour work day),...

Last reply: Felicia Ridgeway, Mar 13, 2018, 12:53 pm

Calculating F.T.E. for a police substation

NC-2009 PIf3: Occupant and Usage Data
posted by Joe Malone on Mar 5, 2018, 2:23 pm

We are working on a police substation that houses two precincts with three shifts per precinct. Each shift will have a sergeant at the station (for the whole shift +/-) and the rest are in patrol...

Last reply: Emily Purcell, Mar 5, 2018, 5:34 pm

Gross area v. net area in PI Form 3 and IEQ8.1

NC-2009 PIf3: Occupant and Usage Data
posted by James Bell on Mar 30, 2017, 11:22 am

the right area totals across different credit forms in all circumstances drove the decision to abandon linked data fields in the latest (the v06) version of the credit forms. There are other forum threads...

Last reply: ebru unver, Jan 15, 2018, 5:20 am

Calculating staff and transients for Airport

NC-2009 PIf3: Occupant and Usage Data
posted by Jos Schild on Dec 4, 2017, 9:25 am

For the (re)design of an airport I'm looking for a way to calculate the...

Last reply: Summer Minchew, Dec 4, 2017, 9:44 am

LEED v2009 NC Total Daily Occupancy

NC-2009 PIf3: Occupant and Usage Data
posted by A Commings on Jun 3, 2013, 10:25 am

I have a residential dormitory project with some questions on Table Plf3-3 Total Daily Occupancy. A majority of the building is residential, with a lower level Lobby/Lounge area (Reception and...

Last reply: Jennifer Greenlee, Nov 8, 2017, 2:11 pm

Total project users as a daily average

NC-2009 PIf3: Occupant and Usage Data
posted by Dave Hubka on Sep 15, 2017, 9:12 am

Project Information form #3 version 06 requires the project team to list the 'total project users as a daily average'. 

Does anyone know which credit this links to?

I've looked...

Last reply: Dave Hubka, Sep 18, 2017, 8:37 pm