Log in
Forum » NC-v4 EQp2
Topic

Smoking in a casino floor of a hotel on Native American Land

NC-v4 EQp2: Environmental tobacco smoke control
posted by Summer Gorder on Aug 20, 2021, 9:36 am

I am running into an issue pursuing LEED certification due to this prerequisite for a hotel with a casino, but I saw a comment about a code caveat that poses an interesting opporunity for our...

Last reply: Renee Shirey, Aug 20, 2021, 11:56 am

Casino which allows smoking

NC-v4 EQp2: Environmental tobacco smoke control
posted by Azfar Mohamed on Jul 25, 2021, 10:51 pm

Good day everyone,

We have a project in the design stage, it is a resort with a casino.

The client is considering LEED certification.

The main issue we are facing is to meet...

Last reply: Summer Gorder, Aug 20, 2021, 9:33 am

Prohibiting Smoking in Residential Buildings

NC-v4 EQp2: Environmental tobacco smoke control
posted by Jessica Malta on May 19, 2021, 5:23 pm

I was wondering if anyone has experience with prohibiting smoking in residential units, and, if using condo corporation documents has been a sufficient legal tool for the prohibition of smoking...

Last reply: Emily Purcell, May 19, 2021, 6:16 pm

smoking on private balconies

NC-v4 EQp2: Environmental tobacco smoke control
posted by Andreas Hintz on Sep 9, 2016, 9:33 am

We have an upcoming international new construction project of a multi-family residential building. Due to its numbers of stories LEED NC v4 is the most appropriate rating system to use.

...

Last reply: Jessica Malta, May 19, 2021, 5:18 pm

Signage for addition on top of existing building

NC-v4 EQp2: Environmental tobacco smoke control
posted by Robin Thornton on Apr 7, 2021, 10:30 am

I have a project in which a level is being added to an existing building on a university campus. We are treating the addition as a new building for LEED purposes (i.e. the LEED Project Site Area...

Signage Directly on Entrance Door?

NC-v4 EQp2: Environmental tobacco smoke control
posted by LUCY WILLIAMS on Apr 22, 2019, 10:02 am

Has any team ever had an issue with posting the signage DIRECTLY ON the entrance door in lieu of 10' out on a post?  The credit language says "within 10' of the entrance".  On the door seems...

Last reply: Renee Shirey, Nov 18, 2020, 2:37 pm

Blower Door Test for Residential Units

NC-v4 EQp2: Environmental tobacco smoke control
posted by on Jul 26, 2018, 2:03 pm

If a residential project has 4 floors of condos that allow smoking above 5 floors of apartments that do not allow smoking, does there need to be a blower door test performed for every unit, or...

Signage at Equipment Rooms with Exterior-Only Access

NC-v4 EQp2: Environmental tobacco smoke control
posted by Stephanie Graham on Jan 5, 2018, 1:15 pm

My project is a fleet maintenance garage with storage.  Per prerequisite requirements we are providing the no-smoking signage at all building openings including intakes, overhead doors and other...

Last reply: Stephanie Graham, Jan 9, 2018, 12:51 pm

Dedicated Smoking area for Group Building with distance less than 25 ft

NC-v4 EQp2: Environmental tobacco smoke control
posted by Ashraf Ali Khan Khan on Jan 4, 2018, 8:54 am

We are currently working on NC V4 Group buildings. Project is G+2 with total of 100 buildings and distance between the buildings are less than 25 feet. I am finding difficult to locate dedicated...

Last reply: Paula Melton, Jan 5, 2018, 11:16 am

A Contradicting Requirement

NC-v4 EQp2: Environmental tobacco smoke control
posted by Tee Howard on Nov 9, 2017, 8:26 am

We are currently working on an Airport Project and would like to pursue LEED certification. As a LEED AP, I understand that for the EQp2, there must be no smoking within the building under any...

Last reply: Trista Brown, Nov 16, 2017, 8:36 pm