Advanced Metering- Gas meters

NC-v4 EAc3: Advanced Energy Metering
posted by Pournamasi Rath on Apr 15, 2021, 3:00 pm

Hi,

The Mechnical team on our project is providing separate gas meters as reuqired by the credit, but they specified that the meters are supplied by the utility provider (Nation Grid in...

Last reply: Marcus Sheffer, Aug 16, 2022, 12:31 pm

NCv4- EAc Advanced Metering- VRF system

NC-v4 EAc3: Advanced Energy Metering
posted by Margaret Montgomery on Mar 5, 2018, 3:29 pm

We have a clinic project that is all electric, and will be submetering to meet the Advanced Metering criteria, but we're not finding clarity on one particular point. We will be submetering...

Last reply: Marcus Sheffer, Jul 18, 2022, 2:30 pm

Hotel Rooms Advanced Metering Clarification

NC-v4 EAc3: Advanced Energy Metering
posted by Francesco Lupoi on Jun 14, 2022, 4:40 am

Hi everyone!

In a hotel project we have to meter every single consumption ( lighting, power outlets, HVAC SYSTEM) for every room switchboard panels or we could metering the rooms...

Last reply: Marcus Sheffer, Jun 24, 2022, 3:03 pm

All meters in the system must be capable of reporting hourly, daily, monthly, and annual energy use.

NC-v4 EAc3: Advanced Energy Metering
posted by Chad Thurlow on Apr 19, 2022, 2:47 pm

To Whom This May Concern

One of the meter requirement states "All meters in the system must be capable of reporting hourly, daily, monthly, and annual energy use." My question is, does it...

Last reply: Marcus Sheffer, Apr 22, 2022, 8:50 am

where and how to install advanced meters?

NC-v4 EAc3: Advanced Energy Metering
posted by Sara BENLOUBA on Dec 15, 2021, 11:02 am

Dear all,

We have a tower with multi-storey building, made up of 3 components: Offices, hotel and residential. We follow as a reference the " BD+C NC "

The...

Last reply: Sara BENLOUBA, Dec 23, 2021, 5:07 am

Whole Building Meters

NC-v4 EAc3: Advanced Energy Metering
posted by Dave Hubka on Apr 15, 2021, 2:12 pm

I think whole building meters must also meet the Advanced Metering requirements per the Requirements section of the reference guide however the rest of the reference guide, credit template, and...

Last reply: Marcus Sheffer, Dec 10, 2021, 9:37 am

Definition "individual energy end use"?

NC-v4 EAc3: Advanced Energy Metering
posted by Lise Dannesboe on Jan 6, 2017, 5:58 am

Hi, i went though all the comments on this forum and cannot really find a clear answer to the question i have when i read the sentence: "any individual energy end uses that represent 10% or more...

Last reply: Marcus Sheffer, Mar 4, 2021, 9:38 am

Fans as an End Use

NC-v4 EAc3: Advanced Energy Metering
posted by Pooja Sannamani on Jan 6, 2021, 7:01 pm

Hi, we'd like to make sure we are meeting the intent of the credit correctly when it comes to fans.  

We use IES for energy models which typically breaks fans into meters for exhaust fans...

Last reply: Pooja Sannamani, Jan 8, 2021, 5:16 pm

Tenancy areas with low relevance

NC-v4 EAc3: Advanced Energy Metering
posted by Ricardo Sá on Sep 22, 2020, 1:08 pm

Dear All

 
In the context of a new airport project pursuing LEED certification, a chilled water plant will distribute chilled water to the whole building, including some retail...

Last reply: Marcus Sheffer, Nov 13, 2020, 10:16 am

IT Room Space Cooling

NC-v4 EAc3: Advanced Energy Metering
posted by Mark Zoeteman on Sep 3, 2020, 11:20 am

Reference Guide states under Data Center heading: IT energy consumption, as measured from an uninterruptible power supply (UPS) output meter, should be metered separately from non-IT equipment,...