Forum » CS-2009 EAc2
Topic

Biomass from energetic crops

CS-2009 EAc2: On-Site Renewable Energy
posted by BH . on Apr 23, 2013, 5:16 am

Hi,

does LEED recognize the biomass from energetic crops such like:
-short rotation coppice (Poplar and willow include)
-Grasses and non-woody energy crops (Miscanthus and...

Last reply: Marcus Sheffer, May 6, 2013, 11:19 am

How many credit points does one get by offsetting 7%.

CS-2009 EAc2: On-Site Renewable Energy
posted by Tuana Papile on Apr 2, 2013, 8:31 pm

By using on-site...

Last reply: Tristan Roberts, Apr 4, 2013, 2:34 pm

CHP biofuel certifications

CS-2009 EAc2: On-Site Renewable Energy
posted by Marcello Polverino on Dec 12, 2012, 5:37 am

Hi LEED-User,

I would like to know which documents I need to provide to the USGBC for a block heat and power plant fueled with biogas?

Thanks
Best wishes from Hanover (germany...

Last reply: Tristan Roberts, Mar 15, 2013, 9:11 am

Geothermal (Sometimes you're in, sometimes you're out!)

CS-2009 EAc2: On-Site Renewable Energy
posted by Katie Mesia on Oct 5, 2012, 9:35 am

We are in schematic design on a CS project. The project will have underground parking and will use piles as a foundation. Because they are digging so deep we looked in to using geothermal piles...

Last reply: Marcus Sheffer, Oct 10, 2012, 10:05 am

How to calculate %

CS-2009 EAc2: On-Site Renewable Energy
posted by Emmanuel Pauwels on Jul 27, 2012, 7:29 am

The reference for the calculation is total energy cost. The output of an array of PV panels is in kwh. How do you convert the PV kwh to USD in order to calculate the % considering the energy is...

Last reply: Emmanuel Pauwels, Jul 29, 2012, 12:45 pm

PV in construction phase

CS-2009 EAc2: On-Site Renewable Energy
posted by Emmanuel Pauwels on Jul 27, 2012, 7:16 am

We have filed for design submittal and are moving into construction phase. The client decided to integrate PVs in the project. Will it be possible to apply for this credit in the construction...

Last reply: Marcus Sheffer, Jul 27, 2012, 8:46 am

1% from 15%?

CS-2009 EAc2: On-Site Renewable Energy
posted by Alicja Bieszyńska on Nov 22, 2011, 11:53 am

I'm working on a Core and Shell project and recently I was given the energy model made for us by a consultant. Although the scope of the project is only Core and Shell, the model covers the whole...

Last reply: Marcus Sheffer, Nov 22, 2011, 12:23 pm

Developer Owned On-Site Renewable Energy Sold to Tenants

CS-2009 EAc2: On-Site Renewable Energy
posted by Mark Frey on Jun 1, 2011, 11:14 am

We are working on a LEED CS project where the investor will sell the energy produced on-site by photovoltaic systems to the tenants in the project building, according to internal fees at a...

Last reply: Tristan Roberts, Nov 21, 2011, 1:10 am

Time line for PV installation

CS-2009 EAc2: On-Site Renewable Energy
posted by Sayeed Muhammad on Mar 13, 2011, 9:35 pm

In our project we intend to install PV panels for 300KWp capacity. Its a NC2009 project aiming for LEED platinum. The building is office building with a 24hrs cafeteria. The building has been...

Last reply: Kimberly Frith, Apr 27, 2011, 2:47 pm