Topic | Recent |
---|---|
Innovation- Green Building EducationCS-v4 INc1: Innovationposted by Luis Fretes on Apr 24, 2018, 2:28 pm
I have a couple of questions regarding the Green Building Education credit: 1) Can the Green Cleaning Policy be uploaded as it's own seperate Innovation Credit? 2) One of the... Last reply: Adrienne Franz, Apr 18, 2024, 4:04 pm |
|
Outdoor air in the Baseline ModelNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Apr 17, 2024, 3:06 pm
Hi , I am working on a lab space with 100% OA , for these spaces Cooling load is driving airflow, now the OA that we calculated for Proposed case is not sufficient to maintain the setpoint in the... Last reply: Rajat Wadhwa, Apr 18, 2024, 12:22 pm |
|
Does a "Hot Zone" in a Fire Station need individual door closers?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Adrienne Franz on Apr 18, 2024, 10:09 am
Our Project is a Fire Station that has an area defined as a "hot zone" which includes the apparatus... |
|
Would a fire sprinkler system count as "other process water"NC-v4 WEc4: Water meteringposted by Cindy Quinn on Apr 16, 2024, 9:08 pm
Has anyone had success with a fire sprinkler system being one of the subsystems? Would it count as "other process water"? TIA! Last reply: Andrey Kuznetsov, Apr 17, 2024, 2:46 am |
|
Waste management plan submission with multiple GC'sNC-v4 MRp2: Construction and demolition waste management planningposted by Blake Weaver on Dec 21, 2023, 4:52 pm
I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different... Last reply: Afogreen Build, Apr 16, 2024, 9:00 pm |
|
Number of eligible Innovation credits from Pilot CreditsNC-v4 INc1: Innovationposted by Jason Garvens on Jan 15, 2018, 12:00 pm
Can anyone confirm the number of points that can be earned solely through achieving Pilot credits? The way I read the requirements in the Innovation section it would appear to be up to... Last reply: Afogreen Build, Apr 15, 2024, 8:59 pm |
|
Data Center InquiryEBOM-v4.1 EAp3: Energy Performanceposted by Christian Bösselmann on Jan 25, 2022, 4:56 am
I am working on the recertification (LEED O+M: Existing) of a building, part of which is a data center and therefore uses a significant amount of energy (about one third of the entire project).... Last reply: Jenni Betancourt, Apr 12, 2024, 11:33 am |
|
How to Model Proposed and Baseline HVAC system for a District level heating and Cooling systemNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Apr 11, 2024, 12:16 pm
Hi, I am working on a College Building where Cooling and Heating is done by Hot water and chilled water supplied to the building, Based on the user guide what I see is I need to model a... Last reply: Marcus Sheffer, Apr 11, 2024, 12:35 pm |
|
Interior cross contamination prevention out of scope-CICI-v4 EQc1: Enhanced indoor air quality strategiesposted by Casey Cullen-Woods on Jul 16, 2019, 1:45 pm
I am working on a commercial interior fit out project that would like to pursue this credit. The... Last reply: Catarina Costa Goncalves, Apr 11, 2024, 6:10 am |
|
getting hot water from CHP, but not the power. Can I still get the credit of the power produced?NC-v4 EAp2: Minimum Energy Performanceposted by Moses Chong on Apr 4, 2024, 5:31 pm
Hi! My project is getting hot water from the central... Last reply: Tyler Thumma, Apr 9, 2024, 8:19 am |