Topic | Recent |
---|---|
Easily Achievable Where Mandates are in PlacePilot-Credits SSpc129: Comprehensive Compostingposted by Marsha Gentile on Jun 15, 2023, 4:29 pm
This pilot credit is easily achievable where mandates and infrastructure (by municipality and/or... Last reply: Mario Kranzl, Jan 31, 2024, 7:16 am |
|
Submetering the pool and dialysisNC-v4 WEc4: Water meteringposted by Eslam Elshorbagy on Jan 25, 2024, 11:56 am
Hi. We have a building that is half a fitness facility and the other half a medical clinic. We intend to submeter the pool in the fitness facility and the dialysis equipment in the... |
|
Purchasing Policy PrerequisiteEBOM-v4.1 MRp1: Purchasing Policyposted by Sean Smith on Jan 25, 2024, 10:32 am
I'm working on a project where the property manager told us the only on-going purchases for the buliding are cleaning supplies (brooms, garbage bags, gloves) and all other purchases are tenant... |
|
How to tell if the chemical inventory of a product is disclosed to 0.1% (1000ppm)NC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Ashley Hu on Jun 19, 2018, 7:51 pm
Hello there, Option 1 accepts the following as documentation:
Last reply: Megan Bodin, Jan 24, 2024, 5:21 pm |
|
Public park adjacent to the project boundaryNC-v4.1 SSc3: Open spaceposted by Eslam Elshorbagy on Dec 20, 2023, 3:57 pm
Hello, The project is not meeting the requirements. We only achieved 26% for outdoor space and 15% for vegetated space. Can I use a public park area that shares the same boundary as the... Last reply: Emily Purcell, Jan 3, 2024, 2:05 pm |
|
100% greenfield site admissibilityNC-v4.1 SSc2: Protect or Restore Habitatposted by Carla Rincon on Feb 6, 2023, 10:06 am
Hello everyone, Can you help me clarify if a 100%... Last reply: Talia Mamayek, Jan 2, 2024, 11:47 am |
|
Strategy 7. Operable Windows- ASHRAE 62.1-2016 for windows locationNC-v4.1 EQc1: Enhanced indoor air quality strategiesposted by MAUDE PINTAL on Mar 24, 2022, 3:31 pm
Hello As part of a residential project aimed at LEEDv4 BD+C certification, we are studying the different possibilities to meet the "Enhanced Indoor Air Quality Strategies" credit with the... Last reply: Michael Philp, Dec 8, 2023, 8:10 pm |
|
How can a warehouse extension project (with no regularly occupied space) comply with EQp1?Warehouses-NC-v4 EQp1: Minimum indoor air quality performanceposted by Blake Jackson on Dec 1, 2023, 2:33 pm
I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing. The existing facility won't be impacted, spare for the... Last reply: Dave Hubka, Dec 4, 2023, 9:26 am |
|
LEED certification for open spacesLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Sergio Acevedo on Dec 1, 2023, 3:34 pm
We would like our expansion project to be LEED certified. There will be no physical separation between the existing building and the extension (no walls). In fact, the space will be... |
|
Regularly used exterior entrancesNC-v4 EQc1: Enhanced indoor air quality strategiesposted by Julie Hardy on Nov 7, 2023, 11:20 am
Hello, We have an office building where the main entrance is at the back, close to the parking area. All... Last reply: Dave Hubka, Nov 7, 2023, 12:59 pm |