Log in
Forum » Netherlands
Topic

internal moking area's for an Airport

NC-v4 EQp2: Environmental tobacco smoke control
posted by Ydo Schuuring on May 18, 2017, 3:23 am

For an extension of an excisting airport that is possible LEED certified, the client desires interior smoking areas to prevent 'illegal' smoking inside the airport. This illegal smoking leads to...

Last reply: Tee Howard, Nov 15, 2017, 11:50 pm

Pilot credit: No Cooling Tower [v4- bc+d)

NC-v4 INc1: Innovation
posted by Ydo Schuuring on Feb 28, 2017, 6:29 am

Hello,

For a project no coolingtowers are used. There for we have the possibility to achieve the Pilot credit No Cooling Tower. The following requirements are given:
Projects may...

Last reply: Emma Hughes, Sep 5, 2017, 4:42 pm

LED integrated in facade window frame/ MLO lighting zone

NC-v4 SSc6: Light Pollution Reduction
posted by Ilse Dijkstra-Nugteren on Aug 11, 2017, 4:42 am

We are working on the LEED V4 certification of a project which will be located at the border of a business park and about 3 kilometers away from highways and an international airport. Between the...

Last reply: Bill Swanson, Aug 11, 2017, 8:33 am

Radius

NC-v4 LTc4: Surrounding density and diverse uses
posted by Sylvia Renes on Jul 18, 2017, 9:10 am

Hi,
How does a 1/4 mile radius around the project site from the project boundary looks like? To my interpretation a radius is the area within a given distance from a central point, thus...

Last reply: emily reese moody, Jul 18, 2017, 1:51 pm

Rainwater management- Filters

NC-v4 SSc4: Rainwater management
posted by Jorge Mato Rial on Jun 26, 2017, 11:00 am

Hello Everyone!
I am working in a project, which includes the following types of surfaces:
-Impervious roof areas
-Garden areas
-Impervious vehicle circulation areas...

Last reply: Michael DeVuono, Jul 14, 2017, 10:45 am

ATES in combination with HP

NC-v4 EAc5: Renewable energy production
posted by Ydo Schuuring on Feb 3, 2017, 5:09 am

We would like achieve points for the credit: Renewable Energy Production. The design team is considering an Aquifer Therma Energy Storage (ATES) in combination with a heatpump.
Does this...

Last reply: David Eldridge, Mar 17, 2017, 6:18 pm

Regularly occupied area of an hotel room

NC-v4 EQc7: Daylight
posted by Ilse Dijkstra-Nugteren on Apr 5, 2016, 6:34 am

Should the entrance area of a hotel room (small area (

Last reply: TODD REED, Apr 5, 2016, 8:16 am

LEED rating system change from CS to NC?

LEED Rating System Selection
posted by Jeroen Sap on Sep 18, 2015, 5:53 am

I am working on a Core&Shell office building project. The owner has not yet found a tenant so we are preparing design documentation for LEED CS. I was wondering; what happens when the owners...

Last reply: Katie Peterschmidt, Mar 2, 2016, 11:05 am

Is C&S allowed if you are eligible for NC?

LEED Rating System Selection
posted by Isolda Strom on Mar 2, 2015, 11:38 am

We are in the very early stages of a project that is considering LEED certification. Demarcation is still unclear, but it the client is interested in all options. If a project has control over (a...

Last reply: Isolda Strom, Mar 3, 2015, 8:54 am