Log in
Forum » Greece
Topic

ASHRAE Baseline HVAC System

NC-v4 EAp2: Minimum Energy Performance
posted by Nikos Tsitsikas on Feb 20, 2020, 2:37 am

Hi all,

Can I pick someone's brain about which ASHRAE Baseline HVAC system we should be selecting for a Hospitality project we are working on?

This is a major renovation of an...

Last reply: Nikos Tsitsikas, Feb 25, 2020, 4:16 am

ASHRAE Baseline HVAC System for Healthcare project

NC-v4 EAp2: Minimum Energy Performance
posted by Nikos Tsitsikas on Feb 27, 2020, 7:59 am

Hi all,

A big hospital project is about to kick off and we are wondering which ASHRAE HVAC system we should be using for the Baseline model? Would that be System 8 or are there any special...

Last reply: Marcus Sheffer, Feb 28, 2020, 9:13 am

ASHRAE Baseline HVAC System for Hospitality project

Hospitality-NC-v4 EAp2: Minimum Energy Performance
posted by Nikos Tsitsikas on Feb 18, 2020, 3:18 am

Hi all,

Can I pick someone's brain about which ASHRAE Baseline HVAC system we should be selecting for a Hospitality project we are working on?

This is a major renovation of an...

Last reply: Nikos Tsitsikas, Feb 25, 2020, 4:17 am

Terminal of Airport

Credit Forums
posted by Konstantina Kalliakoudi on Aug 31, 2018, 8:01 am

Hello,

I have a project  for the rating system LEED BD+C that is the Terminal of an airport. 

I was wondering if USGBC had any special guidelines for airports.

1) For example...

Easily Achieved

Pilot-Credits MRpc69: Construction and demolition waste management
posted by Emmanuel Pauwels on May 8, 2018, 11:51 am

We applied this credit in our Project in Athens in Greece and had no difficulty achieving it.

online form SI units not functioning correctly

EBOM-2009 SSc6: Stormwater Quantity Control
posted by GEORGE GKLAVAS on Sep 7, 2017, 12:03 pm

When using the same input data in both forms (IP and SI units) someone should expect the same result (percentage mitigated). The online form with SI units gives a negative percentage mitigated...

Airport Terminal LEED certification

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by KONSTANTINOS VAVALETSKOS on Jun 1, 2017, 11:09 am

In an airport LEED project, only the terminal building is going to be certified. In this case how the LEED Boundary should be defined?

Last reply: Tristan Roberts, Aug 26, 2017, 5:06 pm

Modeling Limitations to the Simulation Program

Data-Centers-NC-v4 EAp2: Minimum Energy Performance
posted by Vasileios Kalfountzos on Jun 13, 2017, 6:40 am

I am currently working on developing the baseline building for our Energy modelling and I'm stuck on the following point of Table G3.1 point 13.
"If the simulation program cannot model a...

Last reply: Marcus Sheffer, Jun 22, 2017, 9:17 am

Outdoor water use reduction LWR values

NC-v4 WEp1: Outdoor water use reduction
posted by Vasileios Kalfountzos on May 5, 2017, 7:02 am

Hello everyone,

I am currently filling in the documents for this particular credit and I get a negative value for...

Baseline system selection

NC-2009 EAp2: Minimum Energy Performance
posted by Charalampos Giannikopoulos on Jun 28, 2016, 9:11 am

For a project that is less than 150,000 ft2 and has 6 floors of which 1 (the basement) is unconditioned would System 6 still be eligible for the project and not System 8? In other words, with...

Last reply: Marcus Sheffer, Jun 29, 2016, 11:44 am