Log in
Forum » United Arab Emirates
Loading...
Topic

LEED Online Form / Energy Star Target Finder

CI-v4 EAp2: Minimum Energy Performance
posted by Nikhil Kumar on Jun 6, 2018, 3:23 am

Hi,

The below-mentioned contents were copied from LEED Online form. Could you explain, how the energy star values should be compared with Energy Model?

Target Finder...

Last reply: Marcus Sheffer, Jul 6, 2018, 11:37 am

LEED Project boundary

NC-v4 MPR2: Must use reasonable LEED boundaries
posted by Neetika Parmar on Feb 9, 2017, 12:05 am

Our Project is an Office cum warehouse. The area distribution is:

Office- air conditioned with an area of 4 000 sq.ft (G+1)
Warehouse- non air conditioned with an area of 84 400 sq...

Last reply: Nadav Malin, Jun 12, 2018, 1:37 pm

LEED v4 EBOM- Commissioning

EBOM-v4 EAc2: Existing building commissioning - implementation
posted by Aber Alvi on Mar 22, 2018, 1:04 am

A project for which level 2 energy audit had been carried out and implemented more than a year ago, can that energy audit report and the measurement and verification results from the last one...

Last reply: Trista Little, May 24, 2018, 8:26 pm

Hoarding dimensions

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Ahmed Labeeb on Mar 5, 2018, 8:07 am

Dear All,

Is there any LEED requirement regarding the hoarding dimensions ( distance from ground to the bottom of the panel)?

As the Site Engineer is asking us (Consultant), I did...

Last reply: Trista Little, May 16, 2018, 9:52 pm

Energy Star Target Finder Outside US?

CI-v4 EAp2: Minimum Energy Performance
posted by Annabelle Cruz on Oct 5, 2017, 8:24 am

We are currently trying to get the certification for one of our projects here in Dubai, UAE which consists of a small office in a 5-storey building under LEED CI v4. LEED process we're...

Last reply: Marcus Sheffer, May 7, 2018, 10:54 am

Monthly Evapotranspiration Rate

NC-v4 WEp1: Outdoor water use reduction
posted by Ahmed Labeeb on Apr 9, 2018, 3:02 am

Dear,

We are working on a project in Dubai and the Client is asking to use the LEED Calculator instead of WaterSense tool. Now, no reference states the monthly evaporanpiration rate for...

Last reply: Ahmed Labeeb, Apr 12, 2018, 1:15 am

Volume to Weight Conversion factors

NC-2009 MRc2: Construction Waste Management
posted by Yohaan Cama on Mar 27, 2018, 10:11 am

Michelle Reott Managing Principal, Earthly Ideas LLC LEEDuser Expert 617 thumbs up March 27, 2018- 11:27 am Yohaan- The LEED 2009 Reference Guide contains a solid waste conversion factor table.  See this discussed at https://leeduser.buildinggreen.com/forum/documenting-diversion-quantities, https://leeduser.buildinggreen.com/forum/volume-weight-conversions, and https://leeduser.buildinggreen.com/forum/weigh-or-not-weigh. As a LEEDuser Basic Member, I don't think you can access the FAQs for this credit-  https://leeduser.buildinggreen.com/credit/NC-2009/MRc2#tab-faq where this is discussed also. Log...

Last reply: Yohaan Cama, Mar 29, 2018, 3:03 am

CI Office v2009- Water Cooled Chiller in Base Case & DCP in Proposed Case

CI-2009 EAc1.3: Optimize energy performance - HVAC
posted by Nikhil Kumar on Feb 26, 2018, 7:02 am

Hi All,

Greetings!

I am doing Energy Model for LEED CI Project under V3 2009 Rating System. The project is G+10 typical floors. Our tenant’s office is located at 9th Floor. Tenant’s...

Last reply: Nikhil Kumar, Mar 8, 2018, 4:26 am

Minimum Indoor Air Quality Performance Calculation

NC-2009 IEQp1: Minimum IAQ Performance
posted by Amal Venugopal on Jul 4, 2017, 7:27 am

My Project is Having one FAHU on roof which is supplying treated Fresh air to all...

Last reply: Malek Abualhaj, Feb 18, 2018, 2:30 am

Occupancy Density and Fresh Air Calculation

NC-v4 EAp2: Minimum Energy Performance
posted by Ahmed Labeeb on Feb 7, 2018, 10:14 am

Dear,

Per LEED Reference Guide, the fresh air for baseline must follow ASHRAE 62.1 - 2010. My Client is asking to use different occupancy...

Last reply: Marcus Sheffer, Feb 9, 2018, 1:21 pm