Log in
Forum » Qatar
Topic

Painting or Coating for Steel Structure

CS-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Ali Soufan on Sep 10, 2015, 1:28 pm

Hi
In a steel...

Last reply: Jon Clifford, Jan 30, 2016, 10:51 pm

Supply fixtures to tenants without installation

CS-2009 WEp1: Water Use Reduction
posted by Ali Soufan on Jun 9, 2015, 2:24 am

Would it be possible to claim performance improvement by supplying the toilet fixtures for all tenants without installing them?

Last reply: Tristan Roberts, Jan 22, 2016, 11:45 am

OPR for LEED ND

General forums
posted by Philippa Cameron on Mar 30, 2015, 7:02 am

Looking through the requirements of LEED ND v4 I can only find reference to the...

Last reply: Casey Studhalter, Apr 1, 2015, 2:18 pm

Occupancy Proof

NC-2009 WEp1: Water Use Reduction
posted by Deepika Parmar on Mar 22, 2015, 4:23 am

What is the documented proof required to be submitted to USGBC confirming on the Occupancy considered for our project. Will a letter from the client confirming on the...

Last reply: Deepika Parmar, Mar 30, 2015, 3:09 am

LEED ND with Buildings Under Construction

General forums
posted by Philippa Cameron on Mar 16, 2015, 5:32 am

If a site has a number of buildings already under construction and substantially complete, the design for most of which does not consider LEED requirements, and the client decides to pursue LEED...

Last reply: Philippa Cameron, Mar 17, 2015, 2:20 am

Email as Client Letter of Commitment

General forums
posted by Nandan Tavkar on Mar 11, 2015, 5:41 am

Can client's emails be used in place of letter of commitment form client? Does USGBC accept emails as evidence?

LEED boundary for a railway station

NC-2009 PIf1: Minimum Program Requirements
posted by Juan Sergio Simborio on Feb 28, 2015, 9:12 am

LEED NC 2009

Our project is a major railway station in Qatar. The shape of the...