Forum » Malaysia
Topic

Prerequisites Vs. Credits

EBOM-v4 EAp1: Energy Efficiency Best Management Practices
posted by Sajedeh Naghavi on Sep 17, 2019, 8:25 am

Hi, I am new to LEED system and in phase 1 of applying for "Certified Level" of an Existing Building (EB); The gap analysis. Based on LEED-v4-...

Water meter installation location

EBOM-v4 WEp1: Indoor water use reduction
posted by Shathiswara Rao on Jun 6, 2019, 9:39 pm

 The potential way to target water reduction is by monitoring the water use for flushing. Is it necessary to install a water meter for each piping that goes to separate toilets? or we can fix one...

Previously developed land

Warehouses-NC-v4 LTc2: Sensitive land protection
posted by Prakash Sekar on Dec 17, 2018, 1:29 am

Location: Malaysia

Project type: Warehouse

The project is located in a site that is previously developed where a portion of the land is already constructed (Manufacturing Unit) and...

Last reply: Blake Jackson, Dec 17, 2018, 9:19 am

OPR BOD

CI-v4 IPc1: Integrative process
posted by werdah shahid on Sep 17, 2018, 11:10 pm

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5796 thumbs up September 18, 2018- 11:24 am Check out the commissioning forums. I think there might be samples there. Log in or register to post comments emily reese moody Sustainability Director, Certifications & Compliance Jacobs LEEDuser Expert 434 thumbs up September 18, 2018- 11:35 am Indeed, you can find example templates on the prereq page under the Documentation Toolkit. You may need to have a full subscription to be able to see the content there. https://leeduser.buildinggreen.com/credit/CI-v4/EAp1#tab-docs  Log in or register...

Last reply: emily reese moody, Sep 18, 2018, 11:35 am

Energy Simulation Baseline

CS-2009 EAc1: Optimize Energy Performance
posted by Yong Lee Low on Dec 17, 2017, 9:48 am

Hi, i'm working on an office building of 95,000sqm using a District Cooling System (DCS). I am using the HAP E20 software for simulation. What should be the baseline of the cooling system be?...

Last reply: Marcus Sheffer, Dec 18, 2017, 10:39 am

General Emissions Evaluation

NC-v4 EQc2: Low-emitting materials
posted by Joshua Chia on Apr 11, 2017, 7:28 am

Hi All! Appreciate if someone can help with the following.

The reference guide states that for projects overseas, the products can be tested to either CDPH or AgBB. Unfortunately, finding...

Last reply: Jorge Lopez de Obeso, Nov 27, 2017, 10:29 am

International Project- Case 2 Option 1 or Option 2

EBOM-2009 EAc1: Optimize Energy Efficiency Performance
posted by Sheena Moses on Feb 13, 2017, 8:23 am

Dear all,

The case 2 calculator has pointed us towards using Case 2 - Option 1 for our Existing Retail Mall project located outside of the US. Under this option, the calculator states...

Last reply: Ben Stanley, Aug 29, 2017, 2:19 pm

Building Flush Out Inquiry

EBOM-2009 IEQc1.5: Indoor air quality best management practices - indoor air quality management for facility additions and alterations
posted by Sheena Moses on Aug 23, 2017, 2:54 am

We are currently working on an...

Last reply: Ben Stanley, Aug 29, 2017, 12:01 pm

International Project- Case 2 Option 1 or Option 2

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Sheena Moses on Aug 24, 2017, 1:22 am

Dear all,

We have a retail mall in Malaysia targeting LEED...

Last reply: Ben Stanley, Aug 29, 2017, 11:32 am

ACP for Certified Wood vs Pilot for Legal Wood

General forums
posted by Terrapin BrightGreen on Apr 20, 2017, 5:17 pm

Tristan Roberts Representative Vermont House of Representatives LEEDuser Expert 11470 thumbs up May 4, 2017- 11:36 am Catie, I would suggest posting that question to the specific LEED credit forum that's involved. This forum seems a little quiet now. Log in or register to post comments ...

Last reply: Tristan Roberts, May 4, 2017, 11:36 am