Log in
Forum » China
Loading...
Topic

Use of Pavegen as permanent entryway system

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Kollsman Chan on May 20, 2018, 11:04 pm

Hi LEED experts,

I am currently designing a project in Hong Kong that tries to use pavegen with carpet coating at the entrance. I'm wondering if the slots of pavegen can fulfill the IEQ5...

Last reply: Emily Purcell, May 21, 2018, 10:24 am

one product both meet two criteria in option2.

CI-v4 MRc4: Building product disclosure and optimization - sourcing of raw materials
posted by Renaud Gay on Feb 24, 2017, 2:00 am

from a LEED tech team lead in this forum? Log in or register to post comments Michelle Rosenberger Partner, ArchEcology LEEDuser Premium Member 437 thumbs up April 21, 2018- 11:16 am Hi all, Since...

Last reply: Allison Smith, Apr 22, 2018, 3:09 pm

drainage area for sediment basin

NC-2009 SSp1: Construction Activity Pollution Prevention
posted by Hongyun Zhou on Jun 9, 2016, 12:14 pm

when calculating the volume of sediment basin, what is the drainage area? Should I use footprint of the building or total land area of LEED boundary?

Last reply: Ward Miller, Feb 12, 2018, 5:06 am

How to calculate the Tank size

NC-v4 SSc4: Rainwater management
posted by Patrick Y P Lui on Jan 31, 2018, 3:35 am

I am working a hotel project with 6090 sq.m greenery + 14210 sq.m pavement and willing to get 3 points by Percentile of rainfall events (Option 1) - Path 2 98th Percentile.

Information I...

Item C Filtration under Option 1.

CI-v4 EQc1: Enhanced indoor air quality strategies
posted by Hannah Wong on Nov 28, 2017, 1:49 am

The requirement mentioned that ventialtion system that supplies outdoor air to occupied spaces must has particle filters or air-cleaning device that has filtration media meeting...

Calculating the surrounding density

CI-v4 LTc2: Surrounding density and diverse uses
posted by Yee Ting Wong on Nov 22, 2017, 11:14 pm

For the requirement of combined...

What's the size requirement for a Data Center Project with LEED v4 BC+D and O+M?

EBOM-v4 MPR3: Must comply with project size requirements
posted by Xiaoyu Cao on Nov 2, 2017, 4:00 am

Hi,

I see the minimum size requirements for BD+C and O+M is ,

"LEED BD+C and LEED O+M Rating Systems

The LEED project must include a minimum of 1,000 square...

Last reply: Tristan Roberts, Nov 2, 2017, 12:12 pm

A question about high-rise building material waste disposial

NC-v4 MRp1: Storage and Collection of Recyclables
posted by Jianzhushe Lili's on Sep 7, 2017, 12:41 am

Dear all:

Our project has company-wide recycling programs set up which collect...

Last reply: Jianzhushe Lili's, Oct 11, 2017, 6:17 am

Some questions about temporary parking spaces

NC-v4 LTc7: Reduced parking footprint
posted by Jianzhushe Lili's on Sep 7, 2017, 4:22 am

Dear all:

There are some temporary parking spaces within our project building area,and whether these temporary parking spaces are also within the calculation of parking spaces. In addition...

Last reply: Jianzhushe Lili's, Oct 9, 2017, 6:19 am

Question about ASE study area

NC-v4 EQc7: Daylight
posted by Jackie Cheung on May 4, 2017, 11:04 pm

Hello everyone. May I ask 2 questions about this credit?

A) Assuming a project go for option 1. In...

Last reply: TODD REED, Aug 30, 2017, 2:27 pm