Can you please tell me about all compulsory certification fees to get LEED certification?

Registration fees, split / combined design review fees , appeal fees - all are compulsory . Am i...

Last reply: Charles Nepps, Aug 7, 2017, 12:02 pm

Fuel Rates for Non-traditional Fuel Sources

NC-2009 EAp2: Minimum Energy Performance
posted by Gopinath Vasu on Jul 10, 2017, 12:25 am

Hi All,

I am working on a project where rice husk steam boiler is used for process. The fuel source (rice husk) is available at a free of cost for the project.

So, as per LEED...

Last reply: Marcus Sheffer, Jul 17, 2017, 10:37 am

Bamboo Flooring to be considered in certified wood calculations

NC-2009 MRc7: Certified Wood
posted by ABDUL MUTHALIB MOHAMED on Apr 29, 2016, 3:14 am

We have suggested bamboo flooring in a project for 2000 SFT. Should we include bamboo flooring in Certified...

Last reply: Tristan Roberts, Jan 17, 2017, 6:52 pm

n/a

NC-2009 EAc1: Optimize Energy Performance
posted by SAMY Chamy on Jan 28, 2016, 12:25 pm

SAMY Chamy Enginneer T&T Green LEEDuser Basic Member 12 thumbs up January 29, 2016- 10:44 am Awaiting for ur reply Log in or register to post comments Tristan Roberts Technical Director The Laurentia Project, HPDC LEEDuser Expert 11438 thumbs up January 29, 2016- 11:00 am Samy, Marcus and others volunteer a huge amount of time on this forum. Please be patient—you may not get an answer within hours or days. If a question does not get answered, please consider simplifying it or doing more research on your own.Also please understand that experts like Marcus are often hired as consultants on LEED...

Last reply: Victoria Watson, Oct 18, 2016, 12:51 pm

Outdoor Air Delivery Monitoring- Installation of CO2 sensors

NC-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by SAMY Chamy on Jun 3, 2016, 8:35 am

1. CO2 sensors are installed in our project, but not interconnected with fresh air fans....

Last reply: Andrew Mitchell, P.E., Jun 6, 2016, 10:11 am

Dormitory as support building

NC-2009 PIf2: Project Summary Details
posted by ABDUL MUTHALIB MOHAMED on Apr 29, 2016, 3:03 am

We would like to register a factory building in Bangladesh. Th built up area of factory building is 2 lakh SFT, Ground level only. In the same campus, 20 feet away, we have a dormitory building...

Last reply: Alan Scott, Apr 29, 2016, 8:24 am

Venlilation Spaces Only

NC-2009 EAp2: Minimum Energy Performance
posted by SAMY Chamy on Apr 16, 2016, 3:43 am

Dear All:-

Our project have ventilation spaces only (No A/c spaces) so how we model these building in energy model

As per LEED Missing manual we follow below things
"Assign...

Last reply: Marcus Sheffer, Apr 17, 2016, 5:59 pm

Permanent Land /Space Requirement (MPRPp2)

NC-2009 MPR2: Must be a complete, permanent building or space
posted by al-emran hossain on Mar 27, 2016, 7:48 am

Hi LEED Expert ,
We want to know about Minimum Program Requirement (MPRPp2)of permanent space/land matter. Our client has 20 years lease land from BD Gov and build NC factory as a LEED...

Last reply: Tristan Roberts, Mar 27, 2016, 6:49 pm

Energy modeling for LEED project (v3) requirement or not

LEED Rating System Selection
posted by al-emran hossain on Feb 27, 2016, 3:12 pm

We are going to start LEED project (Gold, points 66) in RMG factory at Bangladesh , if we will not consider in energy modeling for v3, that will accept or not , and required then which energy...

Last reply: Saud Abdul Rasheed, Feb 28, 2016, 12:28 am

2 year 24 hour design storm

NC-2009 SSc6.1: Stormwater design - quantity control
posted by ABDUL MUTHALIB MOHAMED on Dec 16, 2015, 8:04 am

do not have enough data to discern anything from what you have posted. What you are trying to do is not easy, and is well outside the scope of this forum. I suggest you read this:...