Topic | Recent |
---|---|
PC MRpc87 FeedbackPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Dan Ackerstein on Sep 8, 2022, 3:45 am
Feedback from the architecture firm and general contractors re: PC implementation in Southern California
Last reply: Michelle Rosenberger, Mar 19, 2024, 12:12 pm |
|
LEED point adjustment when ASHRAE 90.1-2019 is used as baselineNC-v4.1 EAp2: Minimum Energy Performanceposted by elvin ruya on Nov 3, 2022, 6:45 pm
Is there a direct correlation for LEED points when ASHRAE 90.1-2019 baseline is used instead of 2016? Last reply: Eric Dixon, Mar 18, 2024, 10:21 am |
|
Concrete Mixes Counting as Separate Products- One EPDNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Summer Gorder on Jul 2, 2019, 11:49 am
The Concrete supplier utilized multiple "mixes" of concrete in the project. A mix has slightly different functions, which I think would mean it is a separate product based on the USGBC definition... Last reply: Allison Para, Mar 15, 2024, 10:10 am |
|
Pilot Inclusive DesignPilot-Credits INpc125: Inclusive Designposted by Laurie Johnson on Mar 14, 2024, 2:05 pm
I am working on a LEED CI and WELL at Scale project. I am using an approved C13.1 Accessibility and Universal Design: Integrate Universal Design WELL feature as a crosswalk for the LEED Pilot... |
|
Number of seating spaces vs wheelchair spaceHealthcare-v4 SSc7: Places of respiteposted by Priscillia Champagne on Dec 21, 2020, 3:57 pm
Credit language :
Last reply: Priscillia Champagne, Mar 14, 2024, 7:17 am |
|
Testing strips- other manufacturersPilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Glen Boldt on Mar 13, 2024, 8:52 pm
Has anyone had any experience with other manufacturers for the testing strips. Also, what has been the adoption rate of this testing protocol with cleaning staff? |
|
TRUE Waste Certification Advisor RecommendationEBOM-v4.1 MRp3: Waste Performanceposted by Daniel Bertschinger on Mar 13, 2024, 3:32 pm
Hello Everyone! |
|
Any way to download LEED project data?LEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Sustainability Ballinger on Mar 13, 2024, 5:29 pm
I'm working on creating a database of our firm's project data, specifically around our sustainability efforts. I don't currently see any way on the LEED Online website to download in a data-... |
|
EV space accessibilityNC-v4.1 LTc8: Electric Vehiclesposted by Lawrence Rennell on Oct 9, 2023, 12:20 pm
Do all EV spaces required to be available to the general public? We are working on a project with parking spaces located within a restricted access area that will not be accessible to the general... Last reply: Michelle Bombeck, Mar 13, 2024, 11:36 am |
|
Non-linear primary direction of travel.NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Michelle Halle Stern on Jul 14, 2023, 12:44 pm
Our entry includes a centered revolving door with people doors on either side. The path of travel from the people doors requires people entering to change directions toward the center of the room... Last reply: Afogreen Build, Mar 13, 2024, 4:43 am |