Log in
Forum » Panama
Topic

Retail in a large building

Retail-CI-v2009 EAc5: On-Site Renewable Energy
posted by Maria Isabel Conde on Feb 17, 2016, 4:12 pm

We are certifying a small retail store that is almost 5 percent of the total building area. The retail store shares a chilled water plant with the rest of the building. Do I have to model the...

Last reply: Maria Isabel Conde, Apr 8, 2016, 6:51 pm

CS project without bathrooms and elegible fixtures

CS-2009 WEp1: Water Use Reduction
posted by Maria Isabel Conde on Oct 6, 2014, 1:49 pm

We´re working in a CS building without plumbing fixtures. How we can document the WEp1?. We need to make the Tenant Lease agreement?, How we can earn points in WEc3?. We need to specify the...

Last reply: Melissa Kelly, Nov 30, 2015, 6:09 pm

Recycling Batteries

NC-2009 MRc2: Construction Waste Management
posted by Paola Medina on Sep 24, 2015, 4:52 pm

RETIRED LEEDuser Expert 623 thumbs up September 28, 2015- 5:13 pm Paola- If I understand what you are asking, the most relevant forum for this question is Innovation in Design- http://www.leeduser.com/credit/NC-2009/IDc1. As a LEEDuser guest, you can't see the Bird's Eye View there that discusses Path 1- Innovation in Design. It states that: "This approach must represent an innovative design approach to a problem, must be comprehensive in scope, and must have a quantifiable environmental benefit. Approach this path as if you were creating a new LEED “ID credit” from scratch." The FAQs for IDc1 state:...

Last reply: RETIRED, Sep 28, 2015, 5:13 pm

LEED NC v2009: Innovation Design

NC-2009 MRc2: Construction Waste Management
posted by Paola Medina on Sep 23, 2015, 11:19 am

Batteries from other company could be encapsulated with concrete in the fund elevators instead of send to landfills? This could be a credit as Innovation Design for MR c2: Construction Waste...

Natural ventilation

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Gaston Michaud on Oct 2, 2014, 2:44 pm

We are working on a residential core and shell project, and we are having some issues with the compliance of ASHRAE 62-1 ventilation requirements.
Basically, the building has apartments on...

Last reply: Gaston Michaud, Oct 2, 2014, 4:30 pm