Topic

Adding PV to a project AFTER Energy efficiency prelim has been accepted in Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Susan Di Giulio on Aug 15, 2019, 2:40 pm

Hi, 

Our project is designed to be net 0 but will not have the funds allotted to build the PV until either very late in the construction process or even after. Therefore, we can't access...

Last reply: Tiffany Beffel, Oct 21, 2019, 5:44 am

LEED-BD+C Hospitality- MRc5 Option 2 for a modular building.

NC-v4 MRc5: Construction and demolition waste management
posted by Susan Di Giulio on Aug 14, 2019, 8:44 pm

Our project is a hotel for which all guestrooms are being manufactured as modular units. This will certainly save waste, and we are interested in pursuing Option 2. However, it isn't clear if in...

Last reply: Tiffany Beffel, Oct 21, 2019, 5:35 am

LEED 2009 NC Material and Resources- Construction Wast emanagement

NC-2009 MRc2: Construction Waste Management
posted by Judy Bethuy on Jul 31, 2019, 3:10 pm

Do I need track the packaging material from AV and computer equipment as part of the Cpnstruciont Waste Management credit?

Last reply: Tiffany Beffel, Oct 21, 2019, 4:57 am

PCB Waste considered Hazardous Material, not to be tracked?

NC-2009 MRc2: Construction Waste Management
posted by William LaRose on Jul 30, 2019, 4:38 pm

I am tracking demolition waste from several structures that were removed to make room for my current LEED project. These structures contain several reports stating materials such as lead, PCBs,...

Last reply: Tiffany Beffel, Oct 21, 2019, 4:51 am

LEED v4.1 makes changes for commingled waste in Option 1- What do you think?

NC-v4 MRc5: Construction and demolition waste management
posted by Michelle Reott on Jan 23, 2019, 3:21 pm

I'm hopeful that everyone on this forum has seen the BD+C LEED v4.1 new language for MRc5 regarding...

Last reply: ragesh ramadas, Oct 21, 2019, 4:39 am

"closing out" procedure

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by KIMBERLY KRAFT on Aug 18, 2014, 1:19 pm

Hello all-
We received our Preliminary Construction Review from USGBC for a LEED-NC 2009 project. We have been awarded several credits at this review and combined with those awarded with...

Last reply: shashank gangil, Oct 20, 2019, 11:24 pm

Hair washing sinks in a hair-salon

CI-v4 WEp1: Indoor water use reduction
posted by Robin Dukelow on Oct 17, 2019, 5:38 pm

Hello, I am wondering if a hair washing sink/spray valve are considered process water and excluded from the Indoor Water Use Calculator, or if they should be included. Thanks!

Last reply: Robin Dukelow, Oct 19, 2019, 3:34 pm

SMACNA guidelines

NC-v4 EQc3: Construction indoor air quality management plan
posted by Anushka Singh on Oct 19, 2019, 3:27 am

Is it compulsory to follow all...

what is the international standard for air filters?

NC-v4 EQc3: Construction indoor air quality management plan
posted by Anushka Singh on Oct 19, 2019, 1:47 am

The CEN - EN 779 for air filter performance is currently inactive?

CIAQ before occupancy change

NC-v4 EQc3: Construction indoor air quality management plan
posted by Anushka Singh on Oct 18, 2019, 8:56 pm

Why was Construction Indoor Air Quality Management Plan - Before occupancy changed to Indoor Air quality Assessment? The new credit also accounts for 1-2 point where as the earlier one accounted...