Log in
Forum
Loading...
Topic

Occupant feedback

EBOM-2009 IEQp3: Green Cleaning Policy
posted by Judy Bethuy on Jul 11, 2019, 3:00 pm

Occupant Feedback:

  1. Occupant feedback will be collected annually to ensure that green housekeeping products and procedures implemented at ____ do not inhibit or impair...

Last reply: Trista Little, Jul 15, 2019, 6:09 pm

Location Valuation Factor

NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materials
posted by Shannon Oletic on Jul 15, 2019, 6:01 pm

Hello, 

Do all components of a product have to comply with the 160km sourcing requirements in order to apply the location valuation factor in v4? For example, if the recycled scrap within...

Baseline envelope- Existing Buildings (Retrofit)

NC-2009 EAp2: Minimum Energy Performance
posted by João Costa on Oct 9, 2014, 10:11 am

Hello,
I would like to ask if anyone has a comment on two questions regarding the baseline model for existing buildings:

1) According to Table 3.1 from Appendix G, thermal loads due...

Last reply: Waleed AlGhamdi, Jul 15, 2019, 5:34 pm

Recycling treated lumber or plywood?

NC-v4 MRp2: Construction and demolition waste management planning
posted by Renee Shirey on Jul 15, 2019, 5:19 pm

Has anybody found a way to recycle/divert plywood or other engineered...

LEED v4.1 Daylight ASE Requirement

NC-v4.1 EQc7: Daylight
posted by Baha Sadreddin on Jul 15, 2019, 1:59 pm

Hi everyone,

Do the changes to the daylight credit in LEED v4.1 mean that...

Lowest flow shower on the market

NC-v4 WEp2: Indoor water use reduction
posted by Sophie Kerr on Jul 15, 2019, 4:52 pm

What is the lowest flow shower you've come across? The lowest we have is 5.7 LPM (1.5 GPM). 

Whether or not to include certain existing fixtures within the area of work

CI-v4 WEp1: Indoor water use reduction
posted by Bo White on Jul 15, 2019, 3:17 pm

Our area of work includes portions of the first and second floors of a university library in California. On the first floor, only bathrooms are included. On the second floor, the following space...

Any success with this credit yet?

Pilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysis
posted by Sophie Kerr on Oct 29, 2018, 4:11 pm

forum- There are only a few of us who have commented on this in the LEED User forum so my guess is not many have used this pilot credit it or it's been approved for others without participating in the forum. Log in or register to post comments Elaine Goetz Ohio University LEEDuser Basic Member July 15, 2019- 3:06 pm We also completed this credit using Autocase, but have not yet submitted it.  Participating in the LEED user pilot credit forum (this posting) is one of our last steps before submitting.  I'm glad to see that someone has been awarded this credit with no issues.  Conducting a TBL BCA...

Last reply: Elaine Goetz, Jul 15, 2019, 3:06 pm

LEED ND v4 Pilot Credit Integrative Process- Participation in the Forum

ND-Plan-v4 INc1: Innovation
posted by Charlotte Bodnar on Jul 15, 2019, 12:04 pm

As part of the requirements for this pilot credit, we are noting our participation in the Forum for a project located in Montreal that aims the LEED ND v4 certification.

Since our project...

Last reply: Eliot Allen, Jul 15, 2019, 12:40 pm

LESS rating levels: Design Review-Construction Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by saif eddine majdaoui on Jul 14, 2019, 8:04 am

Hello

Can we ask for fewer design credits at the construction review stage?

for example:
We have tended to get a Silver level in the design stage and we are targeting a...

Last reply: Renee Shirey, Jul 15, 2019, 11:45 am