Log in
Forum
Loading...
Topic

Solar Panels

NC-2009 EAc2: On-Site Renewable Energy
posted by PAULA HERNANDEZ on Jan 9, 2017, 8:35 am

Hello,
I am working on a Project that wants to claim all the available points on EA-c2. But they don´t have the space needed to place all the solar panels inside the LEED boundary.
...

Last reply: Sarah Michelman, Dec 12, 2019, 4:02 pm

Output report from simulation software in lieu of calculator?

NC-v4 EQp1: Minimum indoor air quality performance
posted by RDK E&S on Dec 12, 2019, 3:05 pm

Hello! We are working on a residential project and are hoping to use the 62.1 Summary from DesignBuilder in lieu of the Minimum Indoor Air Quality Performance Calculator. Has anyone had success...

Last reply: RDK E&S, Dec 12, 2019, 3:09 pm

LEED AP BD+C on a CI project

CI-v4.1 IN102: LEED Accredited Professional
posted by Joshua Mauldin on Dec 4, 2019, 4:31 pm

The credit requirements state that, "At least one principal participant of the project team must be a LEED Accredited Professional (AP) with a specialty appropriate for the project."  As a LEED...

Last reply: Bipin Karki, Dec 12, 2019, 2:34 pm

"Does compliance with the pilot credit spur market innovation/transformation? "

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Michelle Rosenberger on Nov 12, 2019, 4:08 pm

As part of the survey for this pilot, we are asked if this credit will spur market innovation/transformation. As I've worked through this credit on a few of our projects now, it is apparent how...

Last reply: Deborah Stadler, Dec 12, 2019, 2:20 pm

Location of the recycling bins

Retail-CI-v4 MRp1: Storage and Collection of Recyclables
posted by Ricardo Filho on Dec 11, 2019, 3:40 am

Hi all;

I have a project at concept phase and we are determining the location of the bins;

We have no issues with having all the suggested bins i.e.  ...

Last reply: Bipin Karki, Dec 12, 2019, 2:02 pm

Students (K-12) in ocupancy table for WE calcualtions

Schools-NC-v4 WEp2: Indoor water use reduction
posted by Micaela Smulevich on Dec 12, 2019, 1:17 pm

Greetings! We area working on a NC School certification in Buenos Aires, Argentina. It is anticipated the school occupancy will be 250 students per 4 hour shift. So 500 total, but only 250 Full...

Last reply: Micaela Smulevich, Dec 12, 2019, 1:45 pm

BPDO EPD Construction process Submittals

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Chyanne Husar on Dec 3, 2019, 12:25 pm

We work with architects and contractors to prepare their LEED documentation and our projects require a separate LEED submittal process from Contractor to AOR.  On the contractor side, we are...

Last reply: emily reese moody, Dec 12, 2019, 1:43 pm

planters on terraces

NC-v4 WEp1: Outdoor water use reduction
posted by Agata Mozer on Dec 12, 2019, 12:40 pm

Can anyone confirm if planters located on the terraces should be included in the calculations for this credit?

Anyone been through full review of this credit yet?

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Joanna Switzer on Oct 26, 2017, 2:57 pm

Just curious if anyone has lessons learned on this one yet?

I am researching feasibility/ realistic attainability of this credit. I noticed Sherwin Williams has created some...

Last reply: Renee Azerbegi, Dec 12, 2019, 11:43 am

Exemplary Performance?

Warehouses-NC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Neil Rosen on Dec 11, 2019, 12:30 pm

In version 4, 20 EPDs from at least 5 different manufacturers is required to earn 1 point.  40 EPDs from 5 different manufacturers earns exemplary performance.

In V4.1 Warehouse...

Last reply: Bipin Karki, Dec 12, 2019, 10:45 am