Topic | Recent |
---|---|
Solar PanelsNC-2009 EAc2: On-Site Renewable Energyposted by PAULA HERNANDEZ on Jan 9, 2017, 8:35 am
Hello, Last reply: Sarah Michelman, Dec 12, 2019, 4:02 pm |
|
Output report from simulation software in lieu of calculator?NC-v4 EQp1: Minimum indoor air quality performanceposted by RDK E&S on Dec 12, 2019, 3:05 pm
Hello! We are working on a residential project and are hoping to use the 62.1 Summary from DesignBuilder in lieu of the Minimum Indoor Air Quality Performance Calculator. Has anyone had success... Last reply: RDK E&S, Dec 12, 2019, 3:09 pm |
|
LEED AP BD+C on a CI projectCI-v4.1 IN102: LEED Accredited Professionalposted by Joshua Mauldin on Dec 4, 2019, 4:31 pm
The credit requirements state that, "At least one principal participant of the project team must be a LEED Accredited Professional (AP) with a specialty appropriate for the project." As a LEED... Last reply: Bipin Karki, Dec 12, 2019, 2:34 pm |
|
"Does compliance with the pilot credit spur market innovation/transformation? "Pilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Michelle Rosenberger on Nov 12, 2019, 4:08 pm
As part of the survey for this pilot, we are asked if this credit will spur market innovation/transformation. As I've worked through this credit on a few of our projects now, it is apparent how... Last reply: Deborah Stadler, Dec 12, 2019, 2:20 pm |
|
Location of the recycling binsRetail-CI-v4 MRp1: Storage and Collection of Recyclablesposted by Ricardo Filho on Dec 11, 2019, 3:40 am
Hi all; I have a project at concept phase and we are determining the location of the bins; We have no issues with having all the suggested bins i.e. ... Last reply: Bipin Karki, Dec 12, 2019, 2:02 pm |
|
Students (K-12) in ocupancy table for WE calcualtionsSchools-NC-v4 WEp2: Indoor water use reductionposted by Micaela Smulevich on Dec 12, 2019, 1:17 pm
Greetings! We area working on a NC School certification in Buenos Aires, Argentina. It is anticipated the school occupancy will be 250 students per 4 hour shift. So 500 total, but only 250 Full... Last reply: Micaela Smulevich, Dec 12, 2019, 1:45 pm |
|
BPDO EPD Construction process SubmittalsNC-v4 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Chyanne Husar on Dec 3, 2019, 12:25 pm
We work with architects and contractors to prepare their LEED documentation and our projects require a separate LEED submittal process from Contractor to AOR. On the contractor side, we are... Last reply: emily reese moody, Dec 12, 2019, 1:43 pm |
|
planters on terracesNC-v4 WEp1: Outdoor water use reductionposted by Agata Mozer on Dec 12, 2019, 12:40 pm
Can anyone confirm if planters located on the terraces should be included in the calculations for this credit? |
|
Anyone been through full review of this credit yet?Pilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Joanna Switzer on Oct 26, 2017, 2:57 pm
Just curious if anyone has lessons learned on this one yet? I am researching feasibility/ realistic attainability of this credit. I noticed Sherwin Williams has created some... Last reply: Renee Azerbegi, Dec 12, 2019, 11:43 am |
|
Exemplary Performance?Warehouses-NC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Neil Rosen on Dec 11, 2019, 12:30 pm
In version 4, 20 EPDs from at least 5 different manufacturers is required to earn 1 point. 40 EPDs from 5 different manufacturers earns exemplary performance. In V4.1 Warehouse... Last reply: Bipin Karki, Dec 12, 2019, 10:45 am |