Log in
Forum
Loading...
Topic

Is a Non-Slip Flooring Treatment Applicable for credit calculations?

EBOM-v4 MRc3: Purchasing - facility maintenance and renovation
posted by Andy Stein on Dec 5, 2019, 3:46 pm

I am looking to see if a non-slip flooring treatment would be eligible to be included in the LEED Calculations and requirements for this credit. This is a unique scenario because I do not believe...

Hand held Devices for measuring TVOC

NC-v4.1 EQc4: Indoor air quality assessment
posted by frederick muscatello on Nov 27, 2019, 1:58 pm

Does anyone have any hand held meters for measuring...

Last reply: Samuel Sura, Dec 5, 2019, 4:35 pm

V4.2 EPD Option 2 example

NC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Sue Bryant on Oct 28, 2019, 7:06 pm

Does anyone have examples of material documentation to meet Option 2? Thanks!

Last reply: Adam Yarnell, Dec 5, 2019, 2:41 pm

50% Unbound

Healthcare-v4 SSc5: Heat Island Reduction
posted by Lene Hill on Dec 5, 2019, 11:34 am

What does unbound mean? How is unbound determined? 

Does unbound refer to the % openings in the pavers or the void space in the stone below?   Generally, the stone below a paver section...

Testing the SRI of a paint

NC-v4 SSc5: Heat Island Reduction
posted by Francesco Passerini on Dec 5, 2019, 11:18 am

A paint is going to be applied to the cover of parking spaces. The cover is made of asphalt. The...

Bicycle Storage for transitional housing for homeless

NC-v4 LTc6: Bicycle facilities
posted by Summer Gorder on Dec 4, 2019, 1:00 pm

I am working on a Behavioral Health Resource Center for Multnomah County, and I am not sure how to classify the occupants for the calculations. Please see the breakdown below, and let me know if...

Last reply: Nick Semon, Dec 5, 2019, 11:05 am

LEED HCv4- Calculating overall hospital emplyees on site at peak times

Calculating FTEs
posted by Sarah Michelman on Dec 5, 2019, 10:14 am

Hi, 

My team and I are currently working on a new LEEDv4 HC project and we are having trouble finding the formula to calculate the overall peak hosptial employees on site at peak times, a...

Unenclosed Buildings & LEED

LEED Rating System Selection
posted by Keith Yzquierdo on Dec 4, 2019, 8:54 am

What, if anything, precludes a completely unenclosed building from achieving a LEED certification? Imagine a stand-alone pavilion, band shell, or amphitheater on its own plot of land. These are...

Nursing/skilled care facility- App G baseline

NC-v4 EAp2: Minimum Energy Performance
posted by Adam McMillen on Dec 4, 2019, 11:46 am

Hopefully an easy one here. We have a >150,000 sf nursing home/skilled care facility pursuing LEED. Is this building type classified as residential, so use System 1/2?  I see in the ASHRAE...

LEED AP BD+C on a CI project

CI-v4.1 IN102: LEED Accredited Professional
posted by Joshua Mauldin on Dec 4, 2019, 4:31 pm

The credit requirements state that, "At least one principal participant of the project team must be a LEED Accredited Professional (AP) with a specialty appropriate for the project."  As a LEED...