Log in
Forum
Loading...
Topic

entryway walk-off system in front of each retail shop in CS?

CS-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Alicja Bieszyńska on Sep 5, 2013, 5:21 am

Our project is a mixed use building where groundfloor constitutes retail services and floors from one up are for tenants.

Taking into account that this is a CS certification, do we need to...

Last reply: Guillermo Hernandez Espinoza, Jun 14, 2019, 3:59 pm

Percent of Occupants with access to the fixture.

CS-2009 WEp1: Water Use Reduction
posted by Guillermo Hernandez Espinoza on Jun 14, 2019, 12:04 pm

Hello everyone.

I'm a bit confused with the Percent of Occupants calculation on the Water Use Reduction Calculator.

We only have one model of toilets and dry urinals.
I...

Last reply: Emily Purcell, Jun 14, 2019, 1:51 pm

Pilot Credit Requirment

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Maria Fiorelli on Feb 11, 2019, 11:47 am

I recently pursued this credit for a LEED v4 ID+C office space. It appears as though the credit documentation was approved; although, none of the three products have full documentation. It...

Last reply: Jonathan Napolitano, Jun 14, 2019, 11:37 am

Core Shell Daylighting

CS-v4 EAp2: Minimum Energy Performance
posted by Lorey Flick on Jun 12, 2019, 10:40 am

Lorey Flick Partner, Flick Engineering Professionals LEEDuser Premium Member 38 thumbs up June 12, 2019- 10:46 am Please disregard the last 3 paragraphs- I copied from a previous forum as I wrote my question...Another question- How do you edit after you post??  Log in or register to post comments Marcus Sheffer LEED Fellow, 7group / Energy Opportunities LEEDuser Expert 5508 thumbs up June 12, 2019- 2:43 pm In v4 daylighting for the perimeter spaces is required by 90.1-2010. No daylight can't be excluded from spaces where it is required. If you wish to claim savings for daylighting in tenant spaces you will need...

Last reply: Lorey Flick, Jun 14, 2019, 2:17 am

ASHRAE Level 1 Energy Audit

EBOM-v4.1 EAp1: Energy Efficiency Best Management Practices
posted by Ben McEwen on Jun 13, 2019, 2:48 pm

Regarding the Energy Audit Prerequisite, is there an acceptable age range for a pre-existing energy Audit that was conducted on the building in question? If there was a Level 1 Energy Audit...

Total Building Energy Use

EBOM-v4.1 EAc1: Energy Performance
posted by Ben McEwen on Jun 13, 2019, 3:50 pm

Regarding, EAc1, does it need to include non essential equipment that is on a sub-meter? 

The building in question has a heat exchanger for an outdoor ice skating rink that only operates...

Minimum Indoor Air Quality Performance Calculator: critical zones and demand-controlled ventilation

EBOM-2009 IEQp1: Minimum IAQ Performance
posted by Vincent Dupuy on Jun 13, 2019, 4:22 pm

We are working on certifying a building (...

Discounted off-site parking

CI-v4.1 LTc5: Reduced parking footprint
posted by Carina Clark on Apr 30, 2019, 3:29 pm

Curious how other have looked at this credit from the perspective of the project not having any parking on-site, but do offer the employees discounts to a nearby parking.

Could it be...

Last reply: judhajit chakraborty, Jun 13, 2019, 2:54 pm

WEp Indoor Water Use reduction calculator Tool Calculation

NC-v4 WEc2: Indoor water use reduction
posted by Maria Peralta on Jun 4, 2019, 11:05 am

Hello! I have an inquiry about a WE credit which I describe below:

At the WEp Indoor Water Use reduction calculator Tool Calculation, in the table "Flush fixture" and "Flow fixture...

Last reply: Bipin Karki, Jun 13, 2019, 11:14 am

Bicycle storage on public parking shared with other buildings

NC-v4 LTc6: Bicycle facilities
posted by Russell Davison on Jun 12, 2019, 9:21 am

In the project, we are locating the bicycle storage in a garage that is shared with other buildings. LEED has replied that it is not clear that a sufficient number has been provided. How can I...

Last reply: Bipin Karki, Jun 13, 2019, 7:42 am