Log in
Forum
Loading...
Topic

Integrated dryer and Water Sense labeled faucet

NC-v4 WEp2: Indoor water use reduction
posted by Elizabeth Floyd on Oct 30, 2019, 12:16 pm

If none of the systems with integrated sink/faucet and hand dryer are available with a Water Sense labeled faucet, does that make the product ineligible for Water Sense labeling? (This is for...

Last reply: Sara YOUSSOUFI, Feb 20, 2020, 2:48 am

Lowest flow shower on the market

NC-v4 WEp2: Indoor water use reduction
posted by Sophie Kerr on Jul 15, 2019, 4:52 pm

What is the lowest flow shower you've come across? The lowest we have is 5.7 LPM (1.5 GPM). 

Last reply: Sara YOUSSOUFI, Feb 20, 2020, 2:47 am

ASHRAE Baseline HVAC System

NC-v4 EAp2: Minimum Energy Performance
posted by Nikos Tsitsikas on Feb 20, 2020, 2:37 am

Hi all,

Can I pick someone's brain about which ASHRAE Baseline HVAC system we should be selecting for a Hospitality project we are working on?

This is a major renovation of an...

Quality Views in Non-Regularly Occupied Spaces

Pilot-Credits EQpc117: Quality views in nonregularly occupied spaces
posted by Allison Wilson on Mar 15, 2019, 1:23 pm

In completing the pilot credit survey, I thought the item re: requiring this credit as a prerequisite was interesting. I don't know that this pilot credit would make sense as a prereq, but what...

Last reply: Leilanie Bruce, Feb 19, 2020, 7:07 pm

Assessment and Planning for Resilience Workbook

:
posted by Valerie Walsh on Jul 1, 2016, 3:42 pm

Just a heads up to project teams: I was completing the Hazard Assessment inputs for our project using the pc Workbook and noticed that a line item for the Drought category needs to added to the...

Last reply: Mary Ann Lazarus, Feb 19, 2020, 4:57 pm

Representative Measurements

CS-v4 EQc4: Daylight
posted by Summer Minchew on Feb 19, 2020, 4:25 pm

Similar to how we would address views in a core and shell project, can Option 3 measurements be conducted based on a representative floor plan(s) or would measurements need to be conducted for...

90.1 Mandatory Provisions

NC-2009 EAp2: Minimum Energy Performance
posted by Charles Daze on Oct 20, 2015, 12:47 pm

Does Appendix G or LEED modeling protocol require the baseline building be modeled with all of the mandatory provisions of Section 6.4? And if so where is this stated?

Appendix G implies...

Last reply: Gustavo De las Heras Izquierdo, Feb 19, 2020, 3:41 pm

EDP documents

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by David Dixon on Dec 28, 2016, 4:54 pm

working on documentation for the credit I am finding that the documentation in EDPs do not translate to the credit matrix and documenting is not smooth

Last reply: Nicole Jenkins, Feb 19, 2020, 2:01 pm

Innovation- Bird Collision Deterrence

NC-v4 INc1: Innovation
posted by Geoffrey Katz on Oct 26, 2017, 11:45 am

For the Pilot Credit Bird Collision Deterrence one requirement is to "Develop a three-year post-construction monitoring plan to routinely monitor the effectiveness of the building and site design...

Last reply: Nicole Jenkins, Feb 19, 2020, 1:49 pm

Trying to locate information

NC-v4 WEp2: Indoor water use reduction
posted by Melissa DeB on Feb 19, 2020, 12:43 pm

Efforts to address the water systems in healthcare facilities which are designed to conserve but causing the massive increase in infection and deaths [low flow, low temp, stagnation]. Is LEED for...