Log in
Forum
Loading...
Topic

Demand Response Plan- who creates the plan?

NC-v4 EAc4: Demand response
posted by Deborah Lucking on Aug 15, 2019, 5:32 pm

We have a mechanical engineer, an electrical engineer, a...

Last reply: David Hubka, Aug 16, 2019, 12:40 pm

Composite Wood Doors

NC-v4.1 EQc2: Low-emitting materials
posted by Katie Breshears on Aug 15, 2019, 3:59 pm

The credit language states that the composite...

Appeal for denied credit

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Johnathan Woodside on May 4, 2015, 3:01 pm

If a project has been submitted for review (Design prelim and Construction prelim) comments are received for each review. Upon returning comments from the second review, will the corrections made...

Last reply: Marcus Sheffer, Aug 15, 2019, 3:24 pm

Adding Green Energy points after final construction review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Susan Di Giulio on Aug 15, 2019, 2:48 pm

So we have a difficult v2009 project that strained to achieve simple certification. It came back from prelim construction review with only one comment. The credit in question is worth 2 points...

Last reply: Marcus Sheffer, Aug 15, 2019, 3:02 pm

PV Lease Agreement Clarification

NC-v4 EAc5: Renewable energy production
posted by Jeff Ross-Bain, PE, LEED Fellow on Aug 14, 2019, 1:07 pm

Our project intends to provide land, under a min. 10-year lease, to the local power provider who will install a min. 1MW PV system. The power provider will own the PV system and the Owner has the...

Last reply: Marcus Sheffer, Aug 15, 2019, 2:46 pm

Adding PV to a project AFTER Energy efficiency prelim has been accepted in Design Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Susan Di Giulio on Aug 15, 2019, 2:40 pm

Hi, 

Our project is designed to be net 0 but will not have the funds allotted to build the PV until either very late in the construction process or even after. Therefore, we can't access...

exceptions for farmland?

NC-v4 LTc2: Sensitive land protection
posted by Erica Downs on Feb 5, 2019, 11:20 am

We have an...

Last reply: Erica Downs, Aug 15, 2019, 2:02 pm

APPA Room Type Definitions

EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessment
posted by Alexis Doyle on Aug 9, 2019, 1:00 pm

Hello,

We are working on a building recertification to...

Last reply: Alexis Doyle, Aug 15, 2019, 12:40 pm

Flush-out option preferred, but some furniture delivery delayed

NC-v4 EQc4: Indoor air quality assessment
posted by Erica Downs on Aug 15, 2019, 11:58 am

The project contractor intends to do a full flush-out prior to occupancy.  Most of the furniture will be installed prior to flush-out, but on particular oder has been delayed and may not arrive...

Water Efficiency in CS

LEED v4.1 Discussion Forum
posted by Susan Di Giulio on Aug 5, 2019, 3:59 pm

We are doing a large LEED-CS office building. The owner will provide 2 large restrooms with extremely low water fixtures for tenant employees on each floor. In v4, it seems like regardless of...

Last reply: Marc Mondor, Aug 15, 2019, 11:07 am