Topic | Recent |
---|---|
IEQc8.1- DaylightingNC-2009 IEQc8.1: Daylight and views - daylightposted by Mike Stopka on Aug 1, 2012, 4:38 pm
For IEQc8.1 Daylight – Light: I'm using the prescriptive approach to calculate daylighting for a 4 story office building that is rectangular in plan with floor to ceiling glazing on every... Last reply: Jill Perry, PE, Sep 21, 2012, 1:21 pm |
|
Ceramic Tile AgainNC-2009 IEQc4.3: Low-emitting materials - flooring systemsposted by Panupant Phapant on Sep 17, 2012, 4:42 am
Dear alls, Last reply: Edgar Arevalo, Apr 24, 2024, 1:49 pm |
|
With Specialty expiredGeneral forumsposted by Bill Swanson on Nov 2, 2012, 4:21 pm
I know several people who opted in but never completed the 30 hours of continuing education in the required 2 year period and now have expired specialties. Will these people be treated like all... Last reply: Larry Sims, Jul 4, 2013, 11:41 pm |
|
LEED After or Before?NC-2009 EAp2: Minimum Energy Performanceposted by Robert Sutton on Mar 21, 2013, 11:37 am
Ok I am new to LEED but my architect is telling me that most of the LEED submission take place after the construction documents are done. That seems to smack in the face of what LEED is all... Last reply: Ivy Chen, Mar 24, 2013, 9:51 pm |
|
Exemplary Performance, Point 2NC-2009 IEQc8.2: Daylight and views - viewsposted by Sara Zoumbaris on Apr 30, 2013, 12:58 pm
Hi All, We are interested in attempting the exemplary performance point 2 for this credit on a five story collegiate residence hall. For the views to the outside which must include 2 of... Last reply: TODD REED, Aug 5, 2013, 3:37 pm |
|
(Sample) Lease AgreementCS-2009 EAp2: Minimum Energy Performanceposted by Charalampos Giannikopoulos on Feb 15, 2015, 11:33 am
If no tenants have been identified can the project owner claim relevant energy saving from reduced lighting power... Last reply: Marcus Sheffer, Dec 20, 2018, 5:10 pm |
|
shower in adjacent existing buildingNC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Lyle Axelarris on Mar 4, 2016, 5:36 pm
Does anyone have any experience using the showers in an existing non-LEED building adjacent to the new LEED building for this credit? Both buildings are owned by the same agency and they have... Last reply: Sara Goenner Curlee, Dec 22, 2016, 9:57 am |
|
Number of eligible Innovation credits from Pilot CreditsNC-v4 INc1: Innovationposted by Jason Garvens on Jan 15, 2018, 12:00 pm
Can anyone confirm the number of points that can be earned solely through achieving Pilot credits? The way I read the requirements in the Innovation section it would appear to be up to... Last reply: Afogreen Build, Apr 15, 2024, 8:59 pm |
|
Drawing ReviewNC-v4 EAp1: Fundamental commissioning and verificationposted by Steve Connelly on Mar 1, 2018, 9:18 am
Is a drawing review of the building envelope required by EAp1 Fundamental... Last reply: Scott Bowman, May 25, 2019, 12:12 am |
|
Used AutoCASE software to achieve this creditPilot-Credits INpc122: Informing Design by Major Credit Category Using Triple Bottom Line Analysisposted by Megan Leslie on Dec 6, 2018, 6:24 pm
I am using AutoCASE software to pursue the Informing Design Using Triple Bottom Line Analysis Pilot Credit as well as this Pilot Credit. It is interesting to see the results of the report. Last reply: Candice Rogers, Apr 23, 2024, 10:19 pm |