Log in
Forum
Topic

IEQc8.1- Daylighting

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Mike Stopka on Aug 1, 2012, 4:38 pm

For IEQc8.1 Daylight – Light:

I'm using the prescriptive approach to calculate daylighting for a 4 story office building that is rectangular in plan with floor to ceiling glazing on every...

Last reply: Jill Perry, PE, Sep 21, 2012, 1:21 pm

Ceramic Tile Again

NC-2009 IEQc4.3: Low-emitting materials - flooring systems
posted by Panupant Phapant on Sep 17, 2012, 4:42 am

Dear alls,
I am so confused about the exception for ceramic tile for FloorScore. Normally the ceramic tile has a coating process before burn with high temperature so...

Last reply: Edgar Arevalo, Apr 24, 2024, 1:49 pm

LEED After or Before?

NC-2009 EAp2: Minimum Energy Performance
posted by Robert Sutton on Mar 21, 2013, 11:37 am

Ok I am new to LEED but my architect is telling me that most of the LEED submission take place after the construction documents are done. That seems to smack in the face of what LEED is all...

Last reply: Ivy Chen, Mar 24, 2013, 9:51 pm

Exemplary Performance, Point 2

NC-2009 IEQc8.2: Daylight and views - views
posted by Sara Zoumbaris on Apr 30, 2013, 12:58 pm

Hi All,

We are interested in attempting the exemplary performance point 2 for this credit on a five story collegiate residence hall. For the views to the outside which must include 2 of...

Last reply: TODD REED, Aug 5, 2013, 3:37 pm

shower in adjacent existing building

NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing rooms
posted by Lyle Axelarris on Mar 4, 2016, 5:36 pm

Does anyone have any experience using the showers in an existing non-LEED building adjacent to the new LEED building for this credit? Both buildings are owned by the same agency and they have...

Last reply: Sara Goenner Curlee, Dec 22, 2016, 9:57 am

(Sample) Lease Agreement

CS-2009 EAp2: Minimum Energy Performance
posted by Charalampos Giannikopoulos on Feb 15, 2015, 11:33 am

If no tenants have been identified can the project owner claim relevant energy saving from reduced lighting power...

Last reply: Marcus Sheffer, Dec 20, 2018, 5:10 pm

Number of eligible Innovation credits from Pilot Credits

NC-v4 INc1: Innovation
posted by Jason Garvens on Jan 15, 2018, 12:00 pm

Can anyone confirm the number of points that can be earned solely through achieving Pilot credits? 

The way I read the requirements in the Innovation section it would appear to be up to...

Last reply: Afogreen Build, Apr 15, 2024, 8:59 pm

Drawing Review

NC-v4 EAp1: Fundamental commissioning and verification
posted by Steve Connelly on Mar 1, 2018, 9:18 am

Is a drawing review of the building envelope required by EAp1 Fundamental...

Last reply: Scott Bowman, May 25, 2019, 12:12 am

Are you using Environmental Materials Reporting Forms for the contractors?

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Courtney Royal on Oct 28, 2020, 2:05 pm

In previous versions of LEED, we used Environmental Materials Reporting Forms for contractors to report information for the MR and IEQ credits. However, for v4 what are people typically using for...

Last reply: Stephanie Gowing, Mar 27, 2024, 10:43 am

EV Charger Energy

NC-v4 EAp2: Minimum Energy Performance
posted by Cory Duggin on Nov 19, 2021, 3:10 pm

Does the energy use for EV chargers have to be included in the energy model if you are going after the Electric Vehicles credit?  I thought I had read somewhere that EV charger energy was...

Last reply: Jamy Bacchus, Dec 1, 2021, 10:49 pm