Log in
Forum » Credit Forums
Topic

Pilot Comprehensive Composting sspc 129

CI-v4 INc1: Innovation
posted by Laurie Johnson on Aug 2, 2022, 8:15 pm

I am working on the the above Pilot credit using Option 1 Regular Compost Collection and Offste Processing.   The client has chosen to work with the company CompostNow as there is no composting...

Last reply: Mariia Savinska, Sep 10, 2024, 5:31 am

Shell Only Assessment- Compliance with IEQp1 / ASHRAE 60.1 2016

CS-v4.1 EQp1: Minimum indoor air quality performance
posted by Christos Kollias on Sep 5, 2024, 3:50 am

Hi everyone,

I hope you're all doing well. As a newly certified LEED BD+C AP, I have a few questions regarding a project we're currently working on, and I would appreciate your input....

Last reply: Finance Team, Sep 10, 2024, 2:38 am

SRI for a GREENHOUSE

CS-v4 SSc5: Heat Island Reduction
posted by Marion THIBAULT on May 15, 2020, 10:00 am

Hello everyone, I'm working on a project that plans to integrate a greenhouse. I wonder how to consider the roof of the greenhouse for the...

Last reply: Andrey Kuznetsov, Sep 9, 2024, 9:59 pm

Printer room exhaust/Recirculation

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Ayda Sahaf on Sep 6, 2024, 5:58 am

Hello All,

I have a question about printer room exhuast fan. The mechanical designer wants to recirculate the exhuast air from the printer room due to some costing issue and etc, I know it...

Last reply: Andrey Kuznetsov, Sep 9, 2024, 9:52 pm

Rainwater management

NC-v4 SSc4: Rainwater management
posted by Ahmed Hamed on Sep 7, 2024, 2:59 pm

how to Calculate runoff volume to be managed on site giving rainfall data?

Enhanced Commissioning- Envelope Commissioning

NC-v4 EAc1: Enhanced Commissioning
posted by Todd Bundren on Sep 6, 2024, 12:13 pm

I am working on a new Cancer Center in St. Louis, MO. We are pursuing the envelope...

Last reply: Joyce Kelly, Sep 7, 2024, 2:42 pm

could fixture fittings be exempt from the scope?

CI-v4 WEp1: Indoor water use reduction
posted by Junko Miyamoto on Jun 20, 2023, 12:16 am

Hello,

In prerequisite, it says 'Projects where fixtures or fixture fittings are not within the tenant spaces are exempt from this prerequisite.' ; however, in credit it says that 'Some of...

Last reply: Andrey Kuznetsov, Sep 7, 2024, 9:09 am

Projects located where standard supply pressure is different than the LEED baseline supply pressure

NC-v4 WEp2: Indoor water use reduction
posted by Takayuki Hirota on Mar 22, 2019, 1:40 am

https://leeduser.buildinggreen.com/forum/how-can-i-check-conformity-tech... There are two posts with the same title, so if the hyperlink doesn't take you to the one with the response that mentions v4 addenda 100001990, please search for the other. Log in or register...

Last reply: emily reese moody, Sep 6, 2024, 2:19 pm

Fixtures in European Projects – What do we do about the pressure given the Flows in Europe

CS-v4 WEc2: Indoor water use reduction
posted by Konstantina Kalliakoudi on Mar 21, 2023, 9:42 am

emily reese moody Sustainability Director, Certifications & Compliance Jacobs LEEDuser Expert 469 thumbs up September 2, 2024- 4:13 pm Hi Konstantina, is this post of help for your situation?  https://leeduser.buildinggreen.com/forum/how-can-i-check-conformity-tech... There are two posts with the same title, so if the hyperlink doesn't take you to the one with the response that mentions v4 addenda 100001990, please search for the other. Log in or register to post comments Andrey Kuznetsov ESG consultant, LEED AP BD+C Self Employed LEEDuser Basic Member 24 thumbs up September 5, 2024- 12:34 am 1. Link is not correct- one must delete "-0%C2%A0" from...

Last reply: emily reese moody, Sep 6, 2024, 2:19 pm

VOC limit of Aerosol Adhesives

NC-v4 EQc2: Low-emitting materials
posted by L W on Feb 11, 2020, 8:21 pm

Debra a. Lombard Construction Administrator/ LEED AP Bywater Woodworks, Inc. LEEDuser Basic Member 46 thumbs up February 12, 2020- 12:05 pm This info link is relevant to aerosol adhesive reporting for v4.1 Schools:  https://leeduser.buildinggreen.com/forum/ieq41-aerosol-adhesives-conversion Log in or register to post comments L W LEEDuser Premium Member 1 thumbs up February 12, 2020- 3:44 pm Debra, Yes, I did see that link before posting but I'm not sure whether it's relevant to LEED v4 or V4.1. It's posted in the 2009 forum for IEQc4.1and I haven't come across any verified...

Last reply: Sara Axon, Sep 6, 2024, 1:24 pm