How to treat a renovation of existing building with areas that a not within the scope of renovation.CS-v4 EAp2: Minimum Energy Performanceposted by Eric Dixon on Nov 12, 2018, 2:43 pm
I am modeling an existing office that is being "re-shelled" and having all of it's windows replaced as well as some HVAC Plant and HVAC zone terminal upgrades in 7 of the 9 floors which are... Last reply: Marcus Sheffer, Nov 12, 2018, 4:40 pm |
|
Atrium LPD, base building fenestration and skylight VTCS-v4 EAp2: Minimum Energy Performanceposted by Martin K on Oct 3, 2018, 6:20 am
Hi all, how should be the atrium lighting power allowance determined in baseline building? If I understand it correctly according to Table 9.6.1 of Standard 90.1-2010 the... Last reply: Marcus Sheffer, Oct 4, 2018, 11:06 am |
|
Mandatory Provisions in Tenant C&S AreasCS-v4 EAp2: Minimum Energy Performanceposted by Michael Hammond on Sep 3, 2018, 5:24 am
To Whom It May Concern: I’m looking for some clarification if I’m modelling Tenant Core & Shell areas correctly under LEED v4 based on some responses I’ve seen on this forum to similar... Last reply: Marcus Sheffer, Sep 7, 2018, 11:01 am |
|
Tenant Lease Agreement & 90.1 Mandatory ProvisionsCS-v4 EAp2: Minimum Energy Performanceposted by Scott Downes on Aug 28, 2018, 11:29 am
To Whom It May Concern: I am working on a team that is about to begin a LEED v4 C&S project and I’d like to clarify a couple of items if you can please help. Based on reviewing... |
|
Claiming Energy Savings in Tenant AreasCS-v4 EAp2: Minimum Energy Performanceposted by Michael Hammond on Aug 15, 2018, 11:20 am
Good afternoon, I’m part of a team working on a LEED v4 Core & Shell project. While working through the project, a tenant has now come on board and they have fitted out the tenant... Last reply: Michael Hammond, Aug 17, 2018, 3:05 am |
|
Exterior Lighting power- Non-tradable- FacadesCS-v4 EAp2: Minimum Energy Performanceposted by Vassil Vassilev on Aug 2, 2018, 10:32 am
Greetings, There is a question about the non-tradable surfaces of the exterior lighting, specifically Facades lighting. The Baseline lighting power allowance for the Facades is... Last reply: Marcus Sheffer, Aug 6, 2018, 9:19 am |
|
Naturally Ventilated Car Park- ASHRAE 90.1-2010 Section 6.4.3.4.5CS-v4 EAp2: Minimum Energy Performanceposted by Ciaran McCabe on Jul 4, 2018, 10:01 am
Hi, Does ASHRAE 90.1-2010 Section 6.4.3.4.5 Enclosed Parking Garage Ventilation apply to a naturally ventilated basement car park? The car park is 2000m2 and has 2 walls (of an... Last reply: Marcus Sheffer, Jul 5, 2018, 10:33 am |
|
Temperatures for Tab.6.8.1ICS-v4 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Jun 25, 2018, 9:07 am
According to Tab.6.8.1I for test procedure for VRF systems we have to consider AHRI 1230. I’m considering AHRI 1230 version “Approved by ANSI on 2 August 2010”. As for heating for machines >... Last reply: Marcus Sheffer, Jun 26, 2018, 9:59 am |
|
Is Energy Recovery Mandatory?CS-v4 EAp2: Minimum Energy Performanceposted by Cathal Heneghan on Jun 21, 2018, 12:32 pm
Hi all Can you confirm if Energy Recovery per 6.5.6.1 is a mandatory requirement for the proposed building? Thanks Last reply: Marcus Sheffer, Jun 22, 2018, 9:41 am |
|
energy recovery controlCS-v4 EAp2: Minimum Energy Performanceposted by Francesco Passerini on Jun 20, 2018, 5:26 am
I’m modelling a System 8 baseline model according to ASHRAE 90.1-2010. An exhaust energy recovery system is needed according to table 6.5.6.1. Since the building is located in... Last reply: Marcus Sheffer, Jun 20, 2018, 10:21 am |