Campus application

NC-v4 SSc4: Rainwater management
posted by Rob Hink on Sep 6, 2016, 3:45 pm

Our LEED project site falls within a larger medical campus which has a campus-wide stormwater management plan which meets the credit requirements. However, the post-development volume within our...

Last reply: Theresa Backhus, May 11, 2017, 10:36 am

Stormwater Collected off-site & Reused inside the building

NC-v4 SSc4: Rainwater management
posted by Charline SEYTIER on Mar 27, 2017, 12:03 pm

Hello everyone,
Our project is planning to collect all the stormwater in an underground tank for...

Last reply: Tristan Roberts, May 5, 2017, 3:12 pm

Amount of rainwater treated with a storage tank

NC-v4 SSc4: Rainwater management
posted by Ricardo Sá on Nov 25, 2016, 1:33 pm

Hi all,

I'm working on a project that is pursuing LEED certification. Stormwater management strategy will be based on the collection of runoff from the roofs in order to...

Green roof compliance on runoff

NC-v4 SSc4: Rainwater management
posted by Filipe Boni on Nov 22, 2016, 7:21 am

Hi!

I'm working on a green roof over a building in IP and want to understand what system (extensive, etc)would be better.

I was able to calculate the 95th percentile of my site (...

Last reply: Filipe Boni, Nov 22, 2016, 7:34 pm

Stormwater discharged to the Bay

NC-v4 SSc4: Rainwater management
posted by Brightworks Sustainability on Nov 14, 2016, 2:03 pm

Hi all,
I am working on a project located close to the Bay. Our site will have bioretention ponds, rain gardens, etc., but for the stormwater not infiltrated on site, it will redirect to...

Last reply: Michael DeVuono, Nov 14, 2016, 2:13 pm

Rainwater Management

NC-v4 SSc4: Rainwater management
posted by Maria Glädt on Aug 24, 2016, 2:34 pm

We are planning to follow option 2 (Natural Land Cover Conditions). The area consists mainly in clay with very low...

Last reply: Maria Glädt, Aug 29, 2016, 10:29 am

n/a

NC-v4 SSc4: Rainwater management
posted by Anastasia Makarenko on Aug 2, 2016, 6:55 am

Dear all,
we're planning to install tank for collecting 180% of stormwater from 95 percentile rainfall event. Collected rainwater will be used for irrigation, but there won't be any...

Last reply: Anastasia Makarenko, Aug 3, 2016, 9:08 am

correction for online reference guide

NC-v4 SSc4: Rainwater management
posted by Lyle Axelarris on May 8, 2014, 9:55 pm

I have subscribed to access for the online v4 Reference Guide, and I noticed a couple of mistakes in the example for this credit. I'm not sure how to provide feedback to USGBC regarding this, so...

Last reply: Theresa Backhus, Apr 22, 2016, 4:04 pm

manage (rainwater) on site

NC-v4 SSc4: Rainwater management
posted by Manuel Martin Delgado on Mar 23, 2016, 8:50 am

Hi,

Is reusing rainwater for flushing toilets an accepted solution for achieving this credit?

Or is reusing for irrigation the only solution accepted?

Thanks.

Last reply: Ashwini Arun, Mar 23, 2016, 4:09 pm

LEED NCv4 getting harder

NC-v4 SSc4: Rainwater management
posted by Marco Valerio Ceccotti on Mar 21, 2016, 1:11 pm

Hi All.

This is just a suggestion.

To achieving this credit the pre-development condition is no more the "existing site" we were talking about in v2009, but is now(LEED v4) the "...

Last reply: Michael DeVuono, Mar 21, 2016, 1:32 pm