Imperil and Metric units?NC-v4.1 MRc4: Material Ingredientsposted by Kristi Merdler on Jan 13, 2022, 3:15 pm
I have a project in Canada (metric units) but the client wants all documents in Imperial units. Is this a problem for LEED during the review process? Last reply: Dave Hubka, Jan 15, 2022, 6:13 am |
|
MR credidsNC-v4.1 MRc4: Material Ingredientsposted by Kristi Merdler on Jan 13, 2022, 2:54 pm
My project is using a pre-fabicated panel (walls and ceilings) inclusive of doors, windows and ceiling grid lights. All of these components are part of the panel design. Can I pull out each... Last reply: Tommy Linstroth, Jan 13, 2022, 3:04 pm |
|
MR- material ingredientsLEED Canada Forumposted by Kristi Merdler on Jan 11, 2022, 6:17 pmPaula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 178 thumbs up January 12, 2022- 9:10 am Hi, Kristi! Not sure of the answer to your question, but I'm thinking you will have more luck getting an answer if you post it here: https://leeduser.buildinggreen.com/forums?f%5B0%5D=im_field_credits%3A5066 Log in or register to post comments ... Last reply: Paula Melton, Jan 12, 2022, 9:10 am |
|
Walk in fridge/freezerNC-v4 EAc6: Enhanced Refrigerant Managementposted by Sophie Kerr on Jan 5, 2022, 5:30 pm
Hello, I'm trying to determine if a walk in fridge/freezer would be included in this credit. The guide mentions standard fridges are exempt but the credit guidance seems to be focused on... Last reply: Dave Hubka, Jan 5, 2022, 7:26 pm |
|
zEPI- Documentation requirementsPilot-Credits EApc143: Zero Energy Performance Index (zEPI) ACPposted by Oscar Hernandez Wilches on Apr 23, 2021, 10:42 am
Dear all, I was looking at the documentation requirement for this credit. I have a doubt regarding the ASHRAE 90.1 : This is the requirement :
Last reply: Nadia Bini, Nov 25, 2021, 5:36 pm |
|
Anti-Ligature fixturesNC-v4 WEp2: Indoor water use reductionposted by Leanne Conrad on May 25, 2018, 12:59 pm
The reference guide is clear that special or unique water closets can be excluded from the credit calculations, my query is does this expand to special or unique fixtures? Our client requires... Last reply: Michelle Bombeck, Nov 23, 2021, 11:13 am |
|
Health and Safety Specialist requirementPilot-Credits EQpc44: Ergonomics approach for computer usersposted by Shanwen Hsu on Dec 12, 2018, 4:30 pm
Do we need to provide Ergonomist/ Health and Safety Specialist's bio or prove of credentials? Last reply: Annalise Dum, Nov 15, 2021, 3:58 pm |
|
Project pertaining to only the third floor of a buildingCI-v4 EAc2: Optimize Energy Performanceposted by Peter Downar on Oct 25, 2021, 10:56 am
Last reply: Marcus Sheffer, Oct 29, 2021, 1:26 pm |
|
Exemplary PerformanceNC-v4.1 EQc4: Indoor air quality assessmentposted by Peter Downar on Oct 28, 2021, 11:13 am
The BD+C v4.1 guide states that "Exemplary performance is available for projects that test for the additional target volatile organic Last reply: Russ Pellegrino, Oct 28, 2021, 12:45 pm |
|
Soil stockpiling over the winterNC-v4 SSp1: Construction Activity Pollution Preventionposted by Scott Beckman on Oct 25, 2021, 5:14 pm
We have a correctional project where we are doing some of the sitework now but the project work will be paused over the winter. We will have a soil stockpile and we are concerned about putting a... Last reply: Emily Purcell, Oct 26, 2021, 4:20 pm |