Log in
Forum » Canada
Topic

Imperil and Metric units?

NC-v4.1 MRc4: Material Ingredients
posted by Kristi Merdler on Jan 13, 2022, 3:15 pm

I have a project in Canada (metric units) but the client wants all documents in Imperial units. Is this a problem for LEED during the review process?

Last reply: Dave Hubka, Jan 15, 2022, 6:13 am

MR credids

NC-v4.1 MRc4: Material Ingredients
posted by Kristi Merdler on Jan 13, 2022, 2:54 pm

My project is using a pre-fabicated panel (walls and ceilings) inclusive of doors, windows and ceiling grid lights. All of these components are part of the panel design. Can I pull out each...

Last reply: Tommy Linstroth, Jan 13, 2022, 3:04 pm

MR- material ingredients

LEED Canada Forum
posted by Kristi Merdler on Jan 11, 2022, 6:17 pm

Paula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 178 thumbs up January 12, 2022- 9:10 am Hi, Kristi! Not sure of the answer to your question, but I'm thinking you will have more luck getting an answer if you post it here: https://leeduser.buildinggreen.com/forums?f%5B0%5D=im_field_credits%3A5066 Log in or register to post comments ...

Last reply: Paula Melton, Jan 12, 2022, 9:10 am

Walk in fridge/freezer

NC-v4 EAc6: Enhanced Refrigerant Management
posted by Sophie Kerr on Jan 5, 2022, 5:30 pm

Hello, 

I'm trying to determine if a walk in fridge/freezer would be included in this credit. The guide mentions standard fridges are exempt but the credit guidance seems to be focused on...

Last reply: Dave Hubka, Jan 5, 2022, 7:26 pm

zEPI- Documentation requirements

Pilot-Credits EApc143: Zero Energy Performance Index (zEPI) ACP
posted by Oscar Hernandez Wilches on Apr 23, 2021, 10:42 am

Dear all,

I was looking at the documentation requirement for this credit. I have a doubt regarding the ASHRAE 90.1 :

This is the requirement : 

  • The project shall...

Last reply: Nadia Bini, Nov 25, 2021, 5:36 pm

Anti-Ligature fixtures

NC-v4 WEp2: Indoor water use reduction
posted by Leanne Conrad on May 25, 2018, 12:59 pm

The reference guide is clear that special or unique water closets can be excluded from the credit calculations, my query is does this expand to special or unique fixtures? Our client requires...

Last reply: Michelle Bombeck, Nov 23, 2021, 11:13 am

Health and Safety Specialist requirement

Pilot-Credits EQpc44: Ergonomics approach for computer users
posted by Shanwen Hsu on Dec 12, 2018, 4:30 pm

Do we need to provide Ergonomist/ Health and Safety Specialist's bio or prove of credentials? 

Last reply: Annalise Dum, Nov 15, 2021, 3:58 pm

Project pertaining to only the third floor of a building

CI-v4 EAc2: Optimize Energy Performance
posted by Peter Downar on Oct 25, 2021, 10:56 am

  1. The project pertains to a fit-up of only the 3rd floor of a multi-floor building. The HVAC scope of the renovation does not include changes to the water-side components and only...

Last reply: Marcus Sheffer, Oct 29, 2021, 1:26 pm

Exemplary Performance

NC-v4.1 EQc4: Indoor air quality assessment
posted by Peter Downar on Oct 28, 2021, 11:13 am

The BD+C v4.1 guide states that "Exemplary performance is available for projects that test for the additional target volatile organic
compounds specified in CDPH Standard Method v1.2-2017,...

Last reply: Russ Pellegrino, Oct 28, 2021, 12:45 pm

Soil stockpiling over the winter

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Scott Beckman on Oct 25, 2021, 5:14 pm

We have a correctional project where we are doing some of the sitework now but the project work will be paused over the winter. We will have a soil stockpile and we are concerned about putting a...

Last reply: Emily Purcell, Oct 26, 2021, 4:20 pm